You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Gap-Free Model-Based Engineering for Manufacturing and Analysis: Digital Thread without Translation

    SBC: Nvariate, Inc.            Topic: None

    Modern Model-Based Enterprise / Engineering (MBE) systems rely on freeform surfaces built as complex combinations of geometric primitives to define engineered objects. Unfortunately, the intersection of freeform surfaces in MBE applications results in highly approximated solutions, degrading models that cost billions annually by US industry to fix. Current technology limits the abilities of users ...

    SBIR Phase I 2019 Department of CommerceNational Institute of Standards and Technology
  2. Advanced Manufacturing and Material Measurements Software Tool Weave ™ for the Acceleration and Automation of SEM Image Analysis in the Semiconductor Industry

    SBC: Sandbox Semiconductor Incorporated            Topic: None

    In this Phase I SBIR proposal, SandBox Semiconductor™ proposes to develop an Advanced Manufacturing and Material Measurements software tool called Weave ™ for accelerating and automating SEM image analysis for the semiconductor industry. During the development of a new manufacturing process line for a semiconductor device, tens of thousands of scanning electron microscopy (SEM) images are take ...

    SBIR Phase I 2019 Department of CommerceNational Institute of Standards and Technology
  3. A MODEL FOR EVALUATION OF AVIATION SIMULATION SYSTEMS

    SBC: Epic Sales, Inc. Dba Epic Systems            Topic: N/A

    TO COMPARE COSTS AND TRAINING EFFECTIVENESS OF DIFFERENT FIDELITY OPTIONS OF SIMULATORS AND TRAINING REGIMA, A NEED EXISTS FOR A COMPUTERIZED EXPERT SYSTEM WHICH WILL PERMIT INTERROGATION OF THE VARIOUS DETERMINERS. WE PROPOSE TO DEVELOP THE "ISOPERFORMANCE" MODEL FOR USE BY FAA AND IMPLEMENT IT ON A PERSONAL COMPUTER IN A FULLY UP-AND- RUNNING SOFTWARE PROGRAM. THE KEY TO THE ISOPERFORMANCE APPRO ...

    SBIR Phase I 1990 Department of Transportation
  4. INVESTIGATION OF STRUCTURAL ADHESIVES

    SBC: TEXAS RESEARCH INSTITUTE , AUSTIN, INC.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Transportation
  5. PROGRAMMABLE REFLECTANCE OF ARTIFICIAL FLAWS IN RAIL MATERIALS

    SBC: REINHART & ASSOC., INC.            Topic: N/A

    A PROGRAMMABLE DEFECT SIMULATOR IS NEEDED TO TEST ULTRASONIC RAIL FLAW DETECTION SYSTEMS. CALIBRATION STANDARDS CAN BE DEVELOPED WITH VARIABLE PHYSICAL CHARACTERISTICS ACCORDING TO A PREDESCRIBED SCHEME THAT SIMULATES COMMONLY-OCCURRING FLAWS (CROSS-HEAD FATIGUE CRACKS) IN RAILWAY SYSTEM RAILS. THIS PROJECT WOULD DEVELOP A METHOD OF ALTERING THE EFFECTIVE REFLECTIVITY OF A SOLID-GAS INTERFACE THRO ...

    SBIR Phase I 1987 Department of Transportation
US Flag An Official Website of the United States Government