You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Gap-Free Model-Based Engineering for Manufacturing and Analysis: Digital Thread without Translation

    SBC: Nvariate, Inc.            Topic: None

    Modern Model-Based Enterprise / Engineering (MBE) systems rely on freeform surfaces built as complex combinations of geometric primitives to define engineered objects. Unfortunately, the intersection of freeform surfaces in MBE applications results in highly approximated solutions, degrading models that cost billions annually by US industry to fix. Current technology limits the abilities of users ...

    SBIR Phase I 2019 Department of CommerceNational Institute of Standards and Technology
  2. Advanced Manufacturing and Material Measurements Software Tool Weave ™ for the Acceleration and Automation of SEM Image Analysis in the Semiconductor Industry

    SBC: Sandbox Semiconductor Incorporated            Topic: None

    In this Phase I SBIR proposal, SandBox Semiconductor™ proposes to develop an Advanced Manufacturing and Material Measurements software tool called Weave ™ for accelerating and automating SEM image analysis for the semiconductor industry. During the development of a new manufacturing process line for a semiconductor device, tens of thousands of scanning electron microscopy (SEM) images are take ...

    SBIR Phase I 2019 Department of CommerceNational Institute of Standards and Technology
  3. Multimode Chiroptical Spectrometer for Nanoparticle Characterization

    SBC: APPLIED NANOFLUORESCENCE, LLC            Topic: None

    This project will develop a new scientific instrument optimized for the advanced characterization of near-infrared fluorescent nanoparticles that can exist as left- or right-handed structures (enantiomers). Single-walled carbon nanotubes (SWCNTs) are the leading current example of such nanomaterials. Applied NanoFluorescence, LLC (ANF) proposes a novel multi-mode chiroptical spectrometer that can ...

    SBIR Phase II 2019 Department of CommerceNational Institute of Standards and Technology
  4. A novel enhanced-performance low-cost receiver and modified modulation scheme for WWVB

    SBC: XW, LLC dba Xtendwave            Topic: N/A

    The development of a greatly enhanced receiver for the WWVB signal is targeted, as well as possible modifications in the transmitted signal, which would both offer significant improvements in its effective coverage. This is to be achieved while allowing the replacement of the bulky, expensive, ferrite-based antenna, commonly used in the receiver, with a novel lower-cost antenna. Furthermore, the p ...

    SBIR Phase I 2010 Department of CommerceNational Institute of Standards and Technology
  5. Distributed Automatic Reconfigurable Transponder (DART)

    SBC: WILLIAMSRDM, INC.            Topic: N/A

    Williams-Pyro, Inc. (WPI) has designed and successfully demonstrated a proof-of-concept of the Distributed Automatic Reconfigurable Transponder (DART) that will be capable of achieving distributed multi-nodal voice/data communication for fire fighters. In Phase 2 we will focus on developing a fully functional system that reduces communication failure while maintaining a robust and flexible system. ...

    SBIR Phase II 2006 Department of CommerceNational Institute of Standards and Technology
  6. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  7. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government