You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Aircrew-Mounted Self-Adjusting Tether System

    SBC: WOLF TECHNICAL SERVICES INC            Topic: N171026

    Wolf is developing an aircrew-mounted helicopter restraint system for mobile aircrew that prevents ejection from the aircraft and provides crash and fall protection. It attaches to any D-ring currently used to attach the gunner's belt, and requires no modification to the aircraft to use. It automatically manages the slack between the aircrew and the attachment point. It senses motion associated wi ...

    SBIR Phase II 2019 Department of DefenseNavy
  2. Non-collinear Wave-front Curvature Range Measurement

    SBC: MIKEL INC            Topic: N02025

    The goal of this Phase II SBIR is to extract more information from existing submarine acoustic sensors through a highly innovative inter- and intra-sensor correlation algorithmic, in order to provide U.S. submarines with increased acoustic superiority over increasingly quiet adversaries. U.S. adversaries are continuously improving their acoustic quieting technologies through efforts such as marine ...

    SBIR Phase II 2019 Department of DefenseNavy
  3. Solid State Radar Emitter Identification

    SBC: SEACORP, LLC            Topic: N171043

    The ultimate goal of this SBIR effort is to deliver improvements to existing Fleet electronic warfare support systems by using statistical learning techniques to aid in the classification and unique identification of modern radar emitters. Since software-defined and solid-state emitters do not have the analog features traditionally used for classification, we will use more abstract, but well-defin ...

    SBIR Phase II 2019 Department of DefenseNavy
  4. Rapid Prototype Portable Combat and Launch System

    SBC: SEACORP, LLC            Topic: N95053

    SEA CORP will leverage the innovative technologies developed under the prior SBIR Phase II project and extend the Research & Development (R&D) activities to the development of critical submarine combat system payload integration efforts. In the previous effort, components were successfully developed facilitating integration of Improved Submarine Launched Mobile Mine (ISLMM) capability aboard subma ...

    SBIR Phase II 2019 Department of DefenseNavy
  5. Submarine Shipboard Power Supply Bridge

    SBC: PC KRAUSE & ASSOCIATES INC            Topic: N171075

    The objective of this effort is to construct and test a 40 kW UPS with at least 100ms of holdup time, integrated into a standard 19 inch rack mount enclosure with 4U (7 inch) height, and designed to meet electrical and mechanical/shock specifications required for naval shipboard application. Traditional UPS applications are typically not optimized for weight and volume, and utilize bulky lead-acid ...

    SBIR Phase II 2019 Department of DefenseNavy
  6. Cyber Threat Insertion and Evaluation Technology for Navy Ship Control Systems

    SBC: Amida Technology Solutions, Inc.            Topic: N171054

    Amida's Phase II prototype will be a “user system” comprised of an Evaluation Methodology, a Hardware Emulation Unit, and several software items (Trojan/Trigger Insertion, Instrument/ Countermeasure Insertion, Data Collection and Analysis, and an Evaluation Recommendation). It will be instantiated as a physical device and enable a user to evaluate a system in a virtualized and safe environment ...

    SBIR Phase II 2019 Department of DefenseNavy
  7. Prime Power System Development for Active Denial Technology (ADT) and High-Power Radio-Frequency (RF) Systems

    SBC: CANDENT TECHNOLOGIES INCORPORATED            Topic: N132086

    Solid state RF and millimeter wave weapons systems require substantial power to operate. Pure solid state systems have limited energy density and require charging over the typical use cycle. The directed energy system must be compact enough to mount on a vehicle such as a HMMWV, a small trailer or a structure such as found within an embassy compound. Current power systems are much too large and he ...

    SBIR Phase II 2019 Department of DefenseNavy
  8. Innovative Velocity Sensors

    SBC: Btech Acoustics, LLC            Topic: N141026

    This project involves the development of innovative acoustic motion (accelerometer) sensors with increased tolerances to shock and improving commercial readiness. Investigations and developments of sensor that can withstand is considered.

    SBIR Phase II 2019 Department of DefenseNavy
  9. Power Factor Correction

    SBC: PC KRAUSE & ASSOCIATES INC            Topic: N181005

    The primary objective of this Phase II proposal is to further develop and demonstrate a lightweight passive power factor compensation unit utilizing advanced high-temperature magnetic materials and design techniques to achieve power quality improvement for a 65 kVA, 115V, 400-Hz aircraft power system. Based on identified system problems in the F-18 Super Hornet platform, the compensation system mu ...

    SBIR Phase II 2019 Department of DefenseNavy
  10. Multi-Dimensional Ambient Noise Model

    SBC: Applied Research In Acoustics LLC            Topic: N181082

    To address the Navy need for enhanced ambient-noise modeling for sonar-sensor performance estimation, sonar tactical decision aids (TDAs), and simulation-based training, ARiA will develop, demonstrate, and transition key building blocks for an enhanced multidimensional ambient-noise model (MDANM) needed to overcome the limitations of the current state of practice for noise modeling in sonar TDAs a ...

    SBIR Phase II 2019 Department of DefenseNavy
US Flag An Official Website of the United States Government