You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
High energy density radioisotope batteries for highly stable and long-term reliable power generation
SBC: INFINITY POWER LLC Topic: N191041Nuclear batteries have enormous potential as power sources and have many benefits over other types of portable power sources. Nuclear batteries can provide power for at least as long as the isotope half-life and the energetic nature of nuclear radiation means that only a small mass of radioisotope material is required to achieve a high power output and therefore they can have power densities that ...
SBIR Phase I 2019 Department of DefenseNavy -
Enhancement of Interactive Structural Analysis Environment and Management System (iSAMS)
SBC: Engineering Software Research And Development, Inc. Topic: N03169An Interactive Structural Analysis Environment and Management System (iSAMS), designed to support the practice of simulation governance of engineered repairs of metallic and composite aircraft structures, is enhanced, certified and deployed for production deployment. Repairs to modern military aircraft require certified engineering analysis methods. Methods have evolved with the history of airfram ...
SBIR Phase II 2019 Department of DefenseNavy -
Innovative Approaches for the Flaw-Tolerant Design and Certification of Airframe Components
SBC: Engineering Software Research And Development, Inc. Topic: N08131The computational framework designed to meet the technical requirements of Simulation Governance with the goal of enabling reliable predictions of damage accumulation caused by cyclic loading in metallic airframe components that have small initial flaws, will be validated at the component level. The predictive performance of the model to determine the remaining fatigue life of mechanical component ...
SBIR Phase II 2019 Department of DefenseNavy -
Optimized Build Plate Design Tool for Metal Laser Powder Bed Additive Manufacturing
SBC: PRODUCT INNOVATION AND ENGINEERING LLC Topic: N17BT033Throughout the SBIR Phase I, it was shown that it is possible to develop a solution which was capable of procedurally identifying and generating the support structures necessary for powder bed additive manufacturing (AM). In addition, it was shown that this new combination of support structures greatly increases the likelihood of a quality build. Upon this body of knowledge, the Phase II base will ...
STTR Phase II 2019 Department of DefenseNavy