You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. SBIR Phase I: A Novel Method for Atmospheric Correction of Earth Observation Satellite Data

    SBC: Advanced Remote Sensing, Inc.            Topic: CT

    The broader impact/commercial potential of this Small Business Innovation Research (SBIR) project is to provide software service to correct Earth observation satellite (EOS) data to at-ground reflectance. EOS must look through the Earth?s atmosphere that induces systematic error in measuring the actual reflectance of ground targets through scatter and attenuation of light. Atmospherically-induced ...

    SBIR Phase I 2019 National Science Foundation
  2. DiagSoftfailure: Automated Soft-Failure Diagnostic Tool Using Machine Learning for Network Users

    SBC: INFOBEYOND TECHNOLOGY LLC            Topic: 02c

    As increasing individuals and organizations move their activities and services into online, network performance problems resulting in slow data communication speed becomes the significant obstacle for satisfactory user experience. Currently, there is a lack of a fully automated tool that can help network users to find the complicated network problems that degrade the performance of network applica ...

    SBIR Phase I 2019 Department of Energy
  3. High Performance Diamond Based Transparent X-Ray Beam Imaging System

    SBC: UHV TECHNOLOGIES, INC.            Topic: 13a

    The goal of this Phase I SBIR project is to demonstrate the feasibility of a x-ray beam profile imaging system with a pixel size of less than 50 μm, transparency better than 90% for monochromatic beams >5keV in addition to fast feedback, flux response and dynamic range. Furthermore, the monitor will include real time digital data acquisition and feedback controls with an ability to measure 107 ph ...

    SBIR Phase I 2019 Department of Energy
  4. CODE: Cadet Outcomes Development Evaluation

    SBC: TIER 1 PERFORMANCE SOLUTIONS LLC            Topic: AF182005

    The United States Air Force Academy (USAFA) provides an elite undergraduate educational program that integrates academic, military, and athletic programs to develop leaders of character, motivated to lead the Air Force in service to our nation. By the time cadets graduate and are commissioned as second lieutenants they are expected to acquire a combination of knowledge, skills, and responsibilitie ...

    SBIR Phase I 2019 Department of DefenseAir Force
  5. CSAT: A User-friendly Efficient NIST-spec Information System Development Guideline Tool

    SBC: INFOBEYOND TECHNOLOGY LLC            Topic: None

    NIST developed risk management framework and guidelines that assist agencies to implement integrated, organization‐wide programs to manage information security risk, and further developed Cloud Security Architecture Tool (CSAT) to facilitate in this matter. However, NIST’s CSAT needs further improvement and implementation of new functions such that it can be commercialized as an Enterprise‐g ...

    SBIR Phase II 2019 Department of CommerceNational Institute of Standards and Technology
  6. High thermal conductivity and specific heat nanocomposite epoxy technology for accelerator magnets

    SBC: ENGI-MAT CO            Topic: 29e

    The successful operation of superconducting magnets requires high-performance epoxy that is mechanically strong, electrically insulated, cryogenically compatible and chemically compatible with other superconducting magnet components. For high energy physics (HEP) applications, the epoxy must also be radiation resistant to survive the particle radiation environment. Recent rapid developments in mag ...

    SBIR Phase I 2019 Department of Energy
  7. Gridchain: An Auditable Blockchain for Smart Grid Data Integrity and Immutability

    SBC: INFOBEYOND TECHNOLOGY LLC            Topic: 05a

    We have been witnessed the Industroyer power grid cybersecurity attack in Ukraine’s power system in which attackers controlled the substation’s circuit breakers and protection relays. In 2018, CyberwarCon forum in Washington, DC reported that a variety of hacker groups (e.g., Russian Energetic Bear) have been targeting to the U.S. power grids. For defending these attacks, grid data integrity a ...

    SBIR Phase I 2019 Department of Energy
  8. Thermal Salt Sealing System, Phase I

    SBC: Re/Spec Inc.            Topic: 34a

    Long-term disposal of nuclear waste continues to be an issue of national and international importance. A 2012 Blue Ribbon Commission report to the Secretary of Energy states, .“..this nation’s failure to come to grips with the nuclear waste issue has already proved damaging and costly and it will be more damaging and more costly the longer it continues….” The proposed thermal salt sealing ...

    SBIR Phase I 2019 Department of Energy
  9. In Situ Stress Corrosion Crack Repair and Mitigation

    SBC: VRC Metal Systems, LLC            Topic: 34b

    The U.S. depends on its fleet of nuclear facilities for the clean and reliable generation of electricity. With much uncertainty facing long term, geologic storage facilities, long duration on-site waste storage is being considered. VRC Metal Systems, in collaboration with our academic research partner, the South Dakota School of Mines and Technology (SDSM&T), and our robotics system developer, Rob ...

    SBIR Phase I 2019 Department of Energy
  10. Developing New “Non-stick” Nozzles with High Temperature Tolerance

    SBC: VRC Metal Systems, LLC            Topic: 13a

    The problem being addressed is that electrical generation capacity is expected to fall short in the near future for two reasons. One is that many coal-fired power plants are reaching the end of their life, and the other is that demand for electrical power is expected to increase steadily through year 2050. From emissions concerns, new coal-fired power plants are less likely to be built. While natu ...

    SBIR Phase II 2019 Department of Energy
US Flag An Official Website of the United States Government