You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. High Acceleration and Hypervelocity Inertial Measurement Unit

    SBC: ENGENIUSMICRO LLC            Topic: OSD181001

    Gun-launched applications currently expose inertial measurement units (IMUs) to harsh acceleration, shock, and vibration environments. Furthermore, as they become smarter, they present tighter constraints on size, weight, power, and cost (SWaP-C), while still requiring high levels of performance. New accelerometer technology must reduce SWaP-C while operating through high-g acceleration environmen ...

    SBIR Phase I 2019 Department of DefenseOffice of the Secretary of Defense
  2. High Acceleration and Hypervelocity Inertial Measurement Unit

    SBC: QUALITY SUPPORT, INC.            Topic: OSD181001

    OSD solicits vendors for a ‘High Acceleration and Hypervelocity Inertial Measurement Unit System’ for use in 155mm projectiles. Development of a gun-hardened and highly miniaturized IMU would revolutionize the way in which 155mm gun systems are employed. A 155mm projectile with guidance, navigation and control would enable the development of new systems such as precision gun launched missile d ...

    SBIR Phase I 2019 Department of DefenseOffice of the Secretary of Defense
  3. Electro-optical Seeker

    SBC: POLARIS SENSOR TECHNOLOGIES INC            Topic: OSD181002

    Mission times for high velocity projectiles (HVP) are very short and detection and discrimination of targets must happen quickly and decisively. One way to achieve this is through the enhanced contrast resulting from polarized sensing, which tends to highlight manmade objects and suppress natural background clutter. Thermal polarimetric sensing in a small package has been demonstrated already but ...

    SBIR Phase I 2019 Department of DefenseOffice of the Secretary of Defense
  4. Additively Manufactured Hybrid Windshields with Thermal Protection for Lightweight, Multifunctional, Hyper Velocity Projectiles

    SBC: GOODMAN TECHNOLOGIES LLC            Topic: SCO182003

    One key concern of the Strategic Capabilities Office (SCO) is the security component of the “Asia-Pacific Rebalance” where the Chinese anti-access/area denial (A2/AD) policy threatens regional security. In response to A2/AD our forces in the Pacific require more affordable and rapidly deployable alternatives to costly missile defense such as large caliber projectiles for Navy electroma ...

    SBIR Phase I 2019 Department of DefenseOffice of the Secretary of Defense
  5. Few-shot Object detection via Reinforcement Control of Image Simulation (FORCIS)

    SBC: EXPEDITION TECHNOLOGY, INC.            Topic: SCO182006

    Few-shot Object detection via Reinforcement Control of Image Simulation (FORCIS) will combine deep reinforcement learning with additional training data augmentations and strategies to develop robust few shot detectors leveraging available simulations.

    SBIR Phase I 2019 Department of DefenseOffice of the Secretary of Defense
  6. Critical Program Information (CPI) Identification and Assessment Tool

    SBC: Management Analysis Network, LLC, The            Topic: SCO183002

    Protecting the effectiveness of US advanced weapon systems and the technology they rely on is a national priority. Unfortunately, individuals tasked with this mission are met with disjointed guidance, no training, and competing processes to consider. It is no wonder adversaries continue to exploit these weaknesses in the Department of Defense (DOD); stealing our Critical Program Information (CPI) ...

    SBIR Phase I 2019 Department of DefenseOffice of the Secretary of Defense
  7. HLA Federation Implementation Tools

    SBC: Aegis Technologies Group, LLC, The            Topic: N/A

    The Defense Modeling and Simulation Office (DMSO) has developed the High Level Architecture (HLA) as one of the principle components of a DoD-wide Common Technical Framework for modeling and simulation (M&S). Unlike previous distributed simulation technologies such as DIS and SIMNET, HLA provides federation developers, via the Object Model Template (OMT), the means to define the structure and for ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  8. Computer Enhanced Eddy Current Detection of Hidden Substructure Edges and Holes

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  9. Liquid Crystal-Based Underwater Imager

    SBC: EMPIRICAL TECHNOLOGIES CORPORATION            Topic: N/A

    The contractor proposes a new approach to underwater imaging that directly converts a two-dimmensional acoustic pressure wave into an electronic requirements fo convential piezo-element arrays. The imager relies on the piezo-birefringent properties of a nematic liquid crystal panel that serves as both sensor and display. The capability of nematic liquid crystals has been established and publishe ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  10. Optical Fiber-Based Corrosion System Using Electrochemically Active Coatings

    SBC: LUNA INNOVATIONS INCORPORATED            Topic: N/A

    The objective of the proposed program is to address the high service costs of the current U.S. Navy fleet of aircraft by developing a distributed optical fiber sensor system that will help reduce the costs associated with corrosion damage and extend the lifetime of existing aircraft. Annual corrosion of Navy metallic structures has been estimated as high as $1 billion. Additional costs aris ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
US Flag An Official Website of the United States Government