You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
A CAD-Programmable Environment for Developing CBM Systems for Rotorcraft
SBC: ADVANCED STRUCTURAL TECHNOLOGY, INC. Topic: N/AThe objective of the Phase II research is to utilize the lessons learned from the Phase I risk reduction work to develop a prototype CAD-programmable environment for the development of condition-based maintenance systems for rotorcraft. This developmentenvironment features a CAD scenario modeler for constructing, via click n' drag modeling, fault-to-failure damage models which can account for the ...
SBIR Phase I 2003 Department of DefenseOffice of the Secretary of Defense -
Diesel Driven High Efficiency, Portable 500 Watts Thermoelectric Generator
SBC: HI-Z TECHNOLOGY, INC. Topic: N/AA Diesel driven high efficiency, portable thermoelectric generator capable of producing 500 Watts, scalable to 1500 Watts will be designed at Hi-Z Technology. The unit will supply uninterruptible power at 28 VDC for a minimum of 8 hours. The generatorwill be capable of starting and operating from -32 oC to + 52 oC. The unit system efficiency will be over 10%, it will exhibit a suppressed infrar ...
SBIR Phase I 2003 Department of DefenseOffice of the Secretary of Defense -
High Performance Thermophotovoltaic Emitter System
SBC: QUANTUM GROUP, INC. Topic: N/AAn efficient thermophotovoltaic system that is cost-effective, light weight, and mechanically robust is proposed. The high efficiency is achieved by employing a silicon cell array illuminated by a ytterbium oxide emitter along with a high degree ofthermal recuperation from a thermally stress tolerant ceramic regenerator.A burner, power by aerosolized or atomized logistic fuels, rapidly mixes the ...
SBIR Phase I 2003 Department of DefenseOffice of the Secretary of Defense -
Regime Recognition System
SBC: INTELLIGENT AUTOMATION CORP. Topic: N/AAccurate usage information collected by Health and Usage Monitoring Systems (HUMS) coupled with improved structural fatigue life calculation methodologies promise to reduce helicopter operational and support costs while maintaining current flight safetylevels. Current fatigue life calculations assume worst-case flight profiles in determining component life. This approach may be outdated or not r ...
SBIR Phase I 2003 Department of DefenseOffice of the Secretary of Defense -
Compact, High Capacity Parallel Optical Memories
SBC: Accuwave Corp. Topic: N/AIn this proposed SBIR program, Accuwave will investigate and demonstrate architectures for compact hologrpahic storage using materials and system innovations to reduce complexity and improve performance. Crosstalk, data formatting, input/output interfaces, and other relevant parameters will be characterized. Both wavelength and angle multiplexing, as well as its combination, will be used to prov ...
SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense -
HLA Federation Implementation Tools
SBC: Aegis Technologies Group, LLC, The Topic: N/AThe Defense Modeling and Simulation Office (DMSO) has developed the High Level Architecture (HLA) as one of the principle components of a DoD-wide Common Technical Framework for modeling and simulation (M&S). Unlike previous distributed simulation technologies such as DIS and SIMNET, HLA provides federation developers, via the Object Model Template (OMT), the means to define the structure and for ...
SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense -
Computer Enhanced Eddy Current Detection of Hidden Substructure Edges and Holes
SBC: American Research Corporation of Virginia Topic: N/AN/A
SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense -
Liquid Crystal-Based Underwater Imager
SBC: EMPIRICAL TECHNOLOGIES CORPORATION Topic: N/AThe contractor proposes a new approach to underwater imaging that directly converts a two-dimmensional acoustic pressure wave into an electronic requirements fo convential piezo-element arrays. The imager relies on the piezo-birefringent properties of a nematic liquid crystal panel that serves as both sensor and display. The capability of nematic liquid crystals has been established and publishe ...
SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense -
Optical Fiber-Based Corrosion System Using Electrochemically Active Coatings
SBC: LUNA INNOVATIONS INCORPORATED Topic: N/AThe objective of the proposed program is to address the high service costs of the current U.S. Navy fleet of aircraft by developing a distributed optical fiber sensor system that will help reduce the costs associated with corrosion damage and extend the lifetime of existing aircraft. Annual corrosion of Navy metallic structures has been estimated as high as $1 billion. Additional costs aris ...
SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense -
Development of a Commercial FOM for 3D Interactive Entertainment Applications
SBC: Perceptronics Solutions, Inc. Topic: N/APerceptronics and its team members, Litton Guidance & Control Systems and Infinity Multimedia, will demonstrate that the High Level Architecture (HLA) provides a viable approach for multi-participant entertainment applications and implement an HLA federation and a Federation Object Model (FOM) for this domain. A simple tennis-like game with both 2D and 3D visualization will be used as representat ...
SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense