You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. SBIR Phase I: Neural Network Methods for Robust System Identification

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1996 National Science Foundation
  2. LOW-COST COMPOSITE MANUFACTURING PROCESS

    SBC: Adherent Technologies, Inc.            Topic: N/A

    THE ADVANTAGES OF THERMOPLASTIC MATRIX COMPOSITES FOR MANUFACTURING LOW-COST CMPONENTS HAVE YET TO BE REALIZED. AN IMPORTANT FACTOR LIMITING THERMOPLASTIC COMPOSITES IS THE LACK OF LOW-COST METHOD FOR PRODUCING HIGH-QUALITY PREPREGS AND PREFORMS. A METHOD OF PRODUCING THESE MATERIALS THAT IS COMPATIBLE WITH COMMONLY USED COMPOSITE FABRICATION TECHNIQUES SUCH AS FILAMENT WINDING, PULTRUSION, AND PR ...

    SBIR Phase II 1996 National Science Foundation
  3. A COMMERCIAL SIMULATOR FOR HEALTH PHYSICS TRAINING

    SBC: Consultec Scientific            Topic: N/A

    RESEARCHERS ARE DEVELOPING AN INNOVATIVE NEW APPROACH TO LABORATORY TRAINING IN HEALTH PHYSICS, I.E., THE DEVELOPMENT OF A COMPUTER SIMULATOR THAT CAN BE USED IN PLACE OF ACTUAL RADIATION SOURCES IN LABORATORY TRAINING. SUCH A SIMULATOR RESULTS IN MUCH LOWER COST OF TRAINING, PROVIDES FOR A WIDER VARIETY OF TRAINING SITUATIONS, AND ELIMINATES THE SAFETY HAZARDS ASSOCIATED WITH ACTUAL RADIATION SOU ...

    SBIR Phase II 1996 National Science Foundation
  4. SBIR Phase I: Ultrasensitive Elemental Mercury Pollution Monitor

    SBC: Consultec Scientific            Topic: N/A

    N/A

    SBIR Phase I 1996 National Science Foundation
  5. SBIR PHASE I: The Development of a 600 MHz Wide Bore (89mm)High Resolution NMR Magnet with Internal Tin Wires

    SBC: CRYOMAGNETICS INC            Topic: N/A

    N/A

    SBIR Phase I 1996 National Science Foundation
  6. SBIR Phase I: Rock Art Data Recording, Management and Analysis: An Integrated System Incorporating 3-dimensional Digitizing, Geographic Information Systems, Photogrammetry..

    SBC: Ebert And Associates            Topic: N/A

    N/A

    SBIR Phase I 1996 National Science Foundation
  7. SBIR Phase I: A Real Time Analyzer for Chlorinated Hydrocarbons

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    N/A

    SBIR Phase I 1996 National Science Foundation
  8. SBIR PHASE I: Self-Patterning Process for Conductive Oxide Contacts for Ferroelectric Thin Film Memory Devices

    SBC: TPL, INC            Topic: N/A

    N/A

    SBIR Phase I 1996 National Science Foundation
  9. SBIR PHASE I: High Performance Nondestructive Evaluation System Using a Giant Magnetoresistance Sensor Array

    SBC: TPL, INC            Topic: N/A

    N/A

    SBIR Phase I 1996 National Science Foundation
  10. IN SITU SPUTTER-INITIATED RESONANCE IONIZATION MICROPROBE ANALYSIS OF ISOTOPIC COMPOSITIONS AND ELEMENTAL ABUNDANCES FOR GEOCHEMISTRY AND COSMOCHEMISTRY

    SBC: ATOM SCIENCES, INC.            Topic: N/A

    RESEARCHERS ARE DEMONSTRATING THE POTENTIAL APPLICABILITY OF THE SPUTTER-INITIATED RESONANCE IONIZATION MICROPROBE (SIRIMP) TECHNIQUE FOR GEOLOGICAL STUDIES BY MEASURING PB ISOTOPE RATIOS AND U/PB ATOMIC RATIOS IN GEOLOGICAL SAMPLES RELEVANT TO GEOCHRONOLOGY. SIRIMP IS BASED ON THE CONCEPT OF RESONANCE IONIZATION OF SPUTTERED ATOMS AND POTENTIALLY OFFERS SEVERAL ADVANTAGES OVER CONVENTIONAL HIGH- ...

    SBIR Phase I 1994 National Science Foundation
US Flag An Official Website of the United States Government