You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Design, Manufacture, and Test of an Underwater Acoustic Intensity Probe

    SBC: Acoustech Corporation            Topic: N/A

    The Acoustech Corporation as the prime contractor and the Pennsylvania State University - Applied Research Labc-atory as the subcontractor propose to design, manufacture, and test an underwater acoustic intensity probe containing a geophone and two-hydrophones encased in a neutrally buoyant package. The results of this proposed effort are anticipated to be highly successful since the researc ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  2. Small Lot Repair/Manufacture of Microcircuit Boards by Laser Deposition

    SBC: Cm Consulting            Topic: N/A

    The final prototype of the Microcircuit Board Repair apparatus will be capable of laying down or lifting metal strips with micrometer dimensions. Under real time computer control, the translation stages will be fully automated or manually controlled. The end user will monitor the process in real time using a camera attached with the source. Laying down the metal lines will be done using Laser C ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  3. Predictive Filtering of Situation Awareness Position Information

    SBC: DANIEL H WAGNER ASSOCIATES INC            Topic: N/A

    The proposed research project is directed at the problem of reducing communications requirements for Situation Awareness Target location by using an optimal Kalman filter to predict target motion, and only communicating data when the target position differs sufficiently from the position predicted by the filter. Our Phase I approach is to quantify the bandwidth limitations of the communications s ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  4. Development of Self-Repairing Concrete Containers of Radioactive Waste Using Superelastic Reinforcement

    SBC: DPD, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  5. Development of a Performance Assessment Process Controller

    SBC: Innovative Tech. Solutions            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government