You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Low Ground Clearance Vehicle Detection and Warning System

    SBC: ADVANCED TECHNOLOGY AND RESEARCH CORPORATION            Topic: 131FR1

    Highway-rail crossing, at which there is an unusually abrupt change in the level of the road's surface as it crosses the tracks, pose a risk of low ground clearance vehicles becoming stuck on the tracks. Advanced Technology and Research Corporation (ATR) proposes to develop an active detection and advance warning system. The system has three major functional componenets: measurement, decision, ...

    SBIR Phase I 2013 Department of Transportation
  2. Low Ground Clearance Vehicle Detection and Warning System

    SBC: Intelligent Automation, Inc.            Topic: 131FR1

    The problem of low ground clearance vehicles being stuck at tracks of highway-rail grade crossings (HRGC) poses a severe safety risk. Vehicles with long wheelbases and low ground clearance are more likely to be stuck on high-profile HRGCs. Currently there is no commercially available automated system that detects and computes the necessary critical dimensions of low ground clearance vehicles (LGCV ...

    SBIR Phase I 2013 Department of Transportation
  3. Pedestrian Auto Enforcement Program (PAEP)

    SBC: POLARIS SENSOR TECHNOLOGIES INC            Topic: 122FH3

    We propose an innovative Pedestrian Automotive System for Enforcement and Safety (PASES) that combines commercial-off-the-shelf video or camera components and state-of-the-art microwave(radar) systems with sophisticated software that will not only provide more effective enforcement through effective evidentiary information, but will also enable predictive actions based on vehicle and pedestrian be ...

    SBIR Phase I 2013 Department of Transportation
  4. High Throughput Multiple Access Digital Wireless Communications

    SBC: AIMS, INC.            Topic: N/A

    We propose a radically innovative approach to the problem of multiple access communication which promises to revolutionize the modern communication industry by dramatically increasing network throughput. Our approach is based upon two major novel components: (i) hybrid time-frequency allication of communication channel resources, and(ii) non-orthogonal, i.e., overlaping, multiplexed signals. Toge ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  5. Development of a Commercial Multiple Degree of Freedom Measurement System

    SBC: American Research Corporation of Virginia            Topic: N/A

    The Multiple Degree of Freedom Measurement (MDFM) System, developed under Wright Laboratory, has been identified as having strong commercial potential as a significant enhancement to existing products in the machine tool industry for machine tool calibration or coordinate measuring machine enhancement. The MDFM is in need of revision to incorporate state-of-the-art technology, to prepare the devi ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  6. Analysis and Improvement of Trivalent Chromium Conversion Coatings for Aluminum Alloys

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  7. Advanced Six-Degree-of-Freedom (6-D) Laser Measurement System

    SBC: AUTOMATED PRECISION, INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  8. Small Lot Repair/Manufacture of Microcircuit Boards by Laser Deposition

    SBC: Cm Consulting            Topic: N/A

    The final prototype of the Microcircuit Board Repair apparatus will be capable of laying down or lifting metal strips with micrometer dimensions. Under real time computer control, the translation stages will be fully automated or manually controlled. The end user will monitor the process in real time using a camera attached with the source. Laying down the metal lines will be done using Laser C ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  9. Digital Waveform-based System for AE Measurement for NDT

    SBC: Dvp, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Transportation
  10. Cost effective, rapid densification of lightweight ceramic matrix composite LRE components by gas phase reaction synthesis

    SBC: EXOTHERMICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
US Flag An Official Website of the United States Government