You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. High Throughput Multiple Access Digital Wireless Communications

    SBC: AIMS, INC.            Topic: N/A

    We propose a radically innovative approach to the problem of multiple access communication which promises to revolutionize the modern communication industry by dramatically increasing network throughput. Our approach is based upon two major novel components: (i) hybrid time-frequency allication of communication channel resources, and(ii) non-orthogonal, i.e., overlaping, multiplexed signals. Toge ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  2. Development of a Commercial Multiple Degree of Freedom Measurement System

    SBC: American Research Corporation of Virginia            Topic: N/A

    The Multiple Degree of Freedom Measurement (MDFM) System, developed under Wright Laboratory, has been identified as having strong commercial potential as a significant enhancement to existing products in the machine tool industry for machine tool calibration or coordinate measuring machine enhancement. The MDFM is in need of revision to incorporate state-of-the-art technology, to prepare the devi ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  3. Analysis and Improvement of Trivalent Chromium Conversion Coatings for Aluminum Alloys

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  4. Advanced Six-Degree-of-Freedom (6-D) Laser Measurement System

    SBC: AUTOMATED PRECISION, INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  5. Infrared Detectors Using Mercury Manganese Telluride

    SBC: BRIMROSE CORPORATION OF AMERICA            Topic: N/A

    In the proposed research we will investigate methods for improving the performance of very long wavelength infrared (VLWIR) photovoltaic detectors fabricated from Hg1-xMnxTe. This material was chosen because Hg1-xMnxTe has been shown to have superior mechanical, chemical and thermal stability compared Hg1-xCdxTe. During previously SBIR-BMDO funded work, Brimrose Corporation successfully fabricate ...

    SBIR Phase I 1996 Department of DefenseMissile Defense Agency
  6. InP Solar Cell on Porous Silicon for Improved Solar Energy Conversion

    SBC: BRIMROSE CORPORATION OF AMERICA            Topic: N/A

    Brimrose Corporation has developed a novel low-temperature and low energy ion-beam assisted growth process for minimizing the problems and improving the quality of the hetero epitaxial films of III-V compound semiconductors on foreign substrates such as silicon, germanium, etc. The improvement in the quality of hetero epitaxial InP/Si films will be achieved by using this novel low temperature grow ...

    SBIR Phase I 1996 Department of DefenseMissile Defense Agency
  7. AlxGa(1-x)N Solar Blind Detector Material Device Structure Growth & Evaluation

    SBC: BRIMROSE CORPORATION OF AMERICA            Topic: N/A

    Phase I technical objectives of Brimrose Corporation are two fold. They are: 1) Epitaxial growth of AlxGa1-xN solar blind detector material device structure on new lattice and thermal matched substrates and evaluation of the material properties. The film growth will be carried out in Brimrose Corporation's 'Novel' ECR MOMBE Reactor using rare earth permanent magnets; 2) Preliminary epitaxial growt ...

    SBIR Phase I 1996 Department of DefenseMissile Defense Agency
  8. Optical Power Limiters

    SBC: BRIMROSE CORPORATION OF AMERICA            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseMissile Defense Agency
  9. Small Lot Repair/Manufacture of Microcircuit Boards by Laser Deposition

    SBC: Cm Consulting            Topic: N/A

    The final prototype of the Microcircuit Board Repair apparatus will be capable of laying down or lifting metal strips with micrometer dimensions. Under real time computer control, the translation stages will be fully automated or manually controlled. The end user will monitor the process in real time using a camera attached with the source. Laying down the metal lines will be done using Laser C ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  10. Comprehensible Descriptions for Fast Processing of Image Data

    SBC: DATAMAT SYSTEMS RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government