You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Catalytic Conversion Recycling Process for Composite Aircraft Components
SBC: Adherent Technologies, Inc. Topic: N/ACured aircraft composite materials present a particularly difficult challenge for recycling technology. Those materials have mostly thermosetting epoxy matrices and occur in intimate association with metals, paints, and coatings. Current techniques for recycling thermoset composites, mostly for automotive sheet molding compounds (SMC), involve pulverizing the material for use as fillers. Th ...
SBIR Phase II 1998 Department of DefenseNavy -
Real-Time and Fault-Tolerant Open Architecture for Combat Systems
SBC: Applied Research Associates, Inc. Topic: N/AWe propose to develop a layered real-time and fault-tolerant CORBA-based software architecture as a means to realizing an open standards-based middleware for Naval combat systems. The key features of our approach are (1) a low-level interface to a distributed network infrastructure consisting of an integrated real-time and fault-tolerant extension to CORBA patterned after existing and emerging COR ...
SBIR Phase I 1998 Department of DefenseNavy -
High-Rate Single Event Combustion Diagnostics
SBC: Applied Research Associates, Inc. Topic: N/AApplied Research Associates, Inc. (ARA) proposes to develop a high-speed optical pyrometer which can be used on impact tests of reactive materials with metal plates where flash radiography equipment is in use. The unit will measure five narrow spectral bands of light and use their ratios to determine the temperature of the area of interest. It will also utilize an internal video camera to allow ...
SBIR Phase I 1998 Department of DefenseNavy -
Collaborative Systems Engineering Workbench and Network
SBC: MANAGEMENT SCIENCES INC Topic: N/AThe Virtual Engineering firm is a reality, with a team of scientists and engineers scattered at home sites working together to solve tough engineering problems. This SBIR will perform research and development to provide collaborative system engineering tools for network engineering projects. We will explore new directions for collaborative systems engineering (SE) that enable distributed req ...
SBIR Phase II 1998 Department of DefenseNavy -
Multi-dimensional, user-oriented synthetic environment(Muse): A standard synthetic environment system for virtual prototyping
SBC: MUSE TECHNOLOGIES, INC. Topic: N/AWe propose to develop a simulation system that integrates CAD/CAM/CAT tools into a Virtual Manufacturing Environment, and to demonstrate the proof of concept. The proposed system will be based on the demonstrated functionality of Multi-dimensional, user-oriented Synthetic Environment, UuSE (pronounced "muse'). Developed at Sandia National Laboratories by UuSE Technologies, Inc. (principals a ...
SBIR Phase II 1998 Department of DefenseNavy -
Glass Media Blasting- Hazardous Waste Minimization
SBC: SATYA TECH 1 SERVICES Topic: N/AHSATYA Tech 1 Services (SATYA) proposes to develop an alternative engineering method or waste management option for the disposal of hazardous Glass Media Bead-blast Waste (GBW) resulting from the Glass Media abrasive Bead-blasting (GMB) operations. A pollution prevention or waste minimization technique will be developed to help reduce large quantities hazardous GBW that is being generated at ...
SBIR Phase I 1998 Department of DefenseNavy -
Intelligent Coatings for Corrosion Detection Using Fluorescence Lifetime Imaging
SBC: Systems & Processes Engineering Corporation Topic: N/ASystems & Processes Engineering Corporation (SPEC) and Dr. Richard E. Johnson of LeTourneau University proposes to develop a method to encapsulate and embed corrosion sensitive dye molecules into a intelligent aircraft primer coating. We intend to detect the fluorescence changes of dye molecules interaction with corrosion by-products by using frequency domain fluorescence lifetime imaging (F ...
SBIR Phase I 1998 Department of DefenseNavy -
Optimized Scanning Laser Doppler Vibrational Measurements on Rotating Propellers in Water
SBC: Systems & Processes Engineering Corporation Topic: N/ASystems and Processes Engineering Corporation (SPEC) proposes to develop a straightforward methodology for the setup and operation of a rotating beam laser vibrometer to map and measure the vibrations of a rotating naval propeller in water. SPEC will develop a measurement system which integrates a laser vibrometer, a SPEC developed image derotator system, control software and straightforward alig ...
SBIR Phase I 1998 Department of DefenseNavy -
Agile Manufacturing-Simulation and Integration Tools
SBC: TECHNICAL SOLUTIONS, INC. Topic: N/AThe objective of agile manufacturing is to increase competitiveness of the US manufacturing base, while addressing DoD priorities, with a combined goal of improving US global competitiveness and national security. To achieve this objective, significant changes in technology and infrastructure must occur. This proposal addresses a significant component of these required changes, a Next Generation C ...
SBIR Phase II 1998 Department of DefenseNavy -
Fast Room Temperature Cure for Adhesives for Fiber Optic Connectors
SBC: TEXAS RESEARCH INSTITUTE , AUSTIN, INC. Topic: N/ANavy fiber optic connectors use a heat cured adhesive to hold the fiber within the connector ferrule. A cure time of twenty minutes at 120¿ C is currently required. A fast curing (< 3 minutes), room temperature cure adhesive with physical properties that meet the current specification (MIL-A-24792) would result in substantial time and cost savings during connector installation. Texas Res ...
SBIR Phase II 1998 Department of DefenseNavy