You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Three Dimensional Flow Parallel-Processing System for Fast Programmable Real-Time Applications

    SBC: 3D-Computing, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Energy
  2. Ultrafast Polysilylene Scintillators

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  3. High Power Target Design for a Next Generation Radioactive Beam ISOL-Type Facility

    SBC: Amparo Corp.on            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  4. Data Compression Techniques for Portable Computing Environments

    SBC: Fastman, Inc.            Topic: N/A

    The capability to transmit digitized reports to rear echelon forces during an ongoing battle is a critical command and control component. However, projections of the amount of digital traffic over transmissions links raise the distinct possibility that the demand for digital information tranmitted across the battlefield will outstrip channel capacity. Being able to reduce the quantity of traffic ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  5. 500 MW Axial Free Electron Laser Microwave Power Source

    SBC: Jp Accelerator Works            Topic: N/A

    40900 November 18, 1996 JP Accelerator Works, Inc. Linear collider accelerator systems, proposed to extend the frontiers of high energy physics research, require thousands of megawatts of peak rf power at microwave frequencies. Existing rf power devices such as klystrons are limited in rf peak power to levels that would require thousands of devices to po ...

    SBIR Phase I 1996 Department of Energy
  6. Noncontact Viscosity Measurement of Molten Glass Using Laser-Generated Ultrasound for Process Control During Melting and Forming Operations

    SBC: KARTA TECHNOLOGIES            Topic: N/A

    40879 November 13, 1996 Karta Technology, Inc. In almost all glass-manufacturing processes, production yield depends critically on the viscosity of the melt. Because the glass viscosity is a function of temperature, most active control systems monitor the temperature of the molten glass. However, temperature readings are not reliable for measuring viscos ...

    SBIR Phase I 1996 Department of Energy
  7. Novel Proton Exchange Membrane (PEM) for Fuel Cell Application

    SBC: LYNNTECH INC.            Topic: N/A

    40394 November 18, 1996 Lynntech, Inc. Due to their high power density for both stationary or mobile applications, fuel cells employing solid polymer electrolytes have promising applications ranging from portable power sources to electric vehicles to commercial buildings. In a fuel cell, a solid polymer electrolyte should function as an acid electrolyte, ...

    SBIR Phase I 1996 Department of Energy
  8. A New Separation and Treatment Method for Soil and Groundwater Restoration

    SBC: LYNNTECH INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  9. Intelligent Adaptive Systems for Optimal Energy Input in Steelmaking

    SBC: Neural Applications Corp.o            Topic: N/A

    40517 Neural Applications Corporation In the United States steel industry, the total annual electrical energy consumption by electric are furnaces (EAFs) is 16,000,000,000 kwh, at a cost of $600,000,000. Currently, the primary source of thermal energy in EAFs is the electric arc (65% of kwh), with additional energy input from oxy-fuel burners (5%), and other exothermic reactions (30%) that are s ...

    SBIR Phase I 1996 Department of Energy
  10. Efficient Thyratron/Transformer Modulators for Radiofrequency Acclerators

    SBC: North Star Research Corp.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Energy
US Flag An Official Website of the United States Government