You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Exploiting Artificial Intelligence to Improve After Action Reviews for the Digitized Company Team

    SBC: Lb&m Assoc., Inc.            Topic: N/A

    The Close Combat Tactical Trainer (CCTT) after-action review (AAR) system produces a standard set of statistical displays that trainers may use to debrief exercise participants. These displays are difficult to interpret and do not readily reveal to the player unit "WHAT happened" during the battle. If unit players are able to discern "WHAT happened", there are no correlating displays to provide ...

    SBIR Phase II 1997 Department of DefenseArmy
  2. Integration of Performance Models Into Virtual Prototyping Environment

    SBC: TECHNICAL SOLUTIONS, INC.            Topic: N/A

    An opportunity exists for performance models to be integrated into a continuous data flow process receiving data from design tool output and providing results to wargames used for analysis. Design tool outputs an providing results to wargames used for analysis. Design processes specify shape, configuration, materials, function and other required design components to achieve a conceptualized capab ...

    SBIR Phase II 1997 Department of DefenseArmy
  3. Image Processing Using Temporal Cellular Neural Networks

    SBC: Intelligent Reasoning Systems (IRS)            Topic: N/A

    This proposal addresses the development of a compact, high-speed camera system that integrates a Charge-Coupled Device (CCD) solid-state imager and a Temporal Cellular Neural Network (TCNN) (using three-dimensional TC technology) to provide real-time image processing capability for scientific and engineering applications. The integrated CCD/TCNN camera provides high-speed image collection and proc ...

    SBIR Phase II 1996 Department of DefenseArmy
  4. Light Weight Small Volume Stereoscopic Visual Sensors for Telepresence on Robotic Rotorcraft Research Vehicles

    SBC: Telerobotics International,            Topic: N/A

    The Department of Defense is actively pursuing the development of Remotely Operated Vehicles (ROV). Visual feedback provided to the operator is a major component required for the successful control of the ROV. The proposed approach utilizes dual units of a patented TRI imaging system, Omniview TM, in conjunction with a helmet tracking system to create a stereo image representation of the remote en ...

    SBIR Phase II 1996 Department of DefenseArmy
  5. Resolution and Motion-Detection Enhancement Using an Oscillating Saccadi Perception System

    SBC: Intelligent Reasoning Systems (IRS)            Topic: N/A

    Intelligent Reasoning Systems (IRS) is developing an integrated active vision system (AVS) based on design principles derived from experimental analysis of mammalian visual systems. The AVS design is based on a asynchronous analog encoding of location and motion data, and a custom VLSI Hybrid Temporal Processing Element (HTPE) develped by and available soley to IRS (patent pending). The HPTE can o ...

    SBIR Phase II 1994 Department of DefenseArmy
US Flag An Official Website of the United States Government