List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. Sensor Fusion through Advanced Computing Techniques

    SBC: ABTECH CORPORATION            Topic: N/A

    AbTech Corporation proposes to apply its unique abductive information modeling (AIMTM) technology to develop a sensor fusion demonstration for command, control, communication, computer and information systems. Phase I is the necessary and sufficient precursor to an operational disparate sensor fusion for C4I applications. Phase I will show the feasibility of using AIM to model sensor data, threats ...

    SBIR Phase II 1997 Department of DefenseNavy
  2. Modeling Laminar to Turbulent transistion for improved high lift predictions

    SBC: AEROSOFT INC            Topic: N/A

    AeroSoft, Inc. proposes to develop, incorporate and validate transition and anisotropic turbulence models for improving the low-Reynolds number predictions for high-lift airfoil configurations. The turbulence-modeling package will use Menter's two equati

    SBIR Phase I 1997 Department of DefenseNavy
  3. Analysis and Improvement of Trivalent Chromium Conversion Coatings for Aluminum Alloys

    SBC: American Research Corporation of Virginia            Topic: N/A

    The trend toward replacement of highly toxic chemicals with less hazardous alternatives has created the demand for replacement of chromate conversion coatings for corrosion protection of aluminum alloys. Aluminum alloys are the predominate structural material used in aircraft because of their high strength-to-weight ratios, affordability and processability. Aluminum is subject to catastrophic fail ...

    SBIR Phase II 1997 Department of DefenseOffice of the Secretary of Defense
  4. Computer Enhanced Eddy Current Detection of Hidden Substructure Edges and Holes

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  5. Operational Trainer for FFG-7 AAW Combat System

    SBC: ZIMMERMAN ASSOC., INC.            Topic: N/A

    The proposed prototype Operational Trainer for the FFG-7 AAW Combat System will provide the US Navy with a means for training the FFG-7 AAW combat team to operate their equipment in condition 1 watch stations. Each watch station will be provided with the ability to train as they fight by allowing continuous on-board AAW training that includes all elements of the combat system with interactions as ...

    SBIR Phase I 1997 Department of DefenseNavy
  6. Fretting Wear Resistant Coatings for Turbine Engine Applications

    SBC: ANALYTICAL SERVICES & MATERIALS, INC.            Topic: N/A

    Attachment areas in the regions of rotating components of gas turbine engines degrade due to fretting wear and fatigue. Plasma sprayed coatings are often used to protect these regions. A thin, dense, Ti(C, N) composite coating based on sol-gel process is proposed. The simple, cost-effective sol-gel process will coat complex shapes and will provide superior performance against fretting wear. Di ...

    SBIR Phase I 1997 Department of DefenseNavy
  7. High Resolution Time-Frequency Representations

    SBC: AMRON CORPORATION            Topic: N/A

    The objective of the proposed Phase I work is to demonstrate the feasibility of using the Choi-Williams distribution to estimate the time ¿ frequency distribution of transients of interest to the IUSS. The specific objectives are to develop a metric for IUSS images and to show that the Choi-Williams distribution of these images may be used for classification. The Choi-Williams distribution is ...

    SBIR Phase I 1997 Department of DefenseNavy
  8. Engineering Models of Reactive Munitions and Damage Effects

    SBC: Applied Research Associates, Inc.            Topic: N/A

    Warhead design calculations and weapons effectiveness estimates require a methodology to predict structural response and the associated damage to air targets from reactive munitions. The objectives for the proposed Phase I study effort are to develop candidate launch conditioning, reaction initiation and reaction rate methodology, to incorporate existing ballistic, blast and quasi-static pres ...

    SBIR Phase I 1997 Department of DefenseNavy
  9. Development of an EO Wave Imaging System on the Pelican Remotely Piloted Aircraft (RPA)

    SBC: Arete Associates            Topic: N/A

    The goal of this SBIR proposal is to evaluate the suitability of the WESCAM Model 14 EO sensor, currently deployed in the Predator, for oceanographic research use in the Naval Postgraduate School's "Pelican" optionally piloted aircraft. Sensor specifications will be based on Arete's extensive experience in remote sensing of the ocean, and engineering specifications developed with the Naval P ...

    SBIR Phase II 1997 Department of DefenseNavy
  10. Development of an EO Wave Imaging System on the Pelican Remotely Piloted Aircraft (RPA)

    SBC: Arete Associates            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of DefenseNavy

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government