You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. N/A

    SBC: BARRON ASSOCIATES, INC.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseOffice of the Secretary of Defense
  2. N/A

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseOffice of the Secretary of Defense
  3. N/A

    SBC: DOMINCA LLC            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseOffice of the Secretary of Defense
  4. N/A

    SBC: GMA INDUSTRIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseOffice of the Secretary of Defense
  5. N/A

    SBC: PLANNING SYSTEMS, INC.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseOffice of the Secretary of Defense
  6. N/A

    SBC: Research Development Corporation            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseOffice of the Secretary of Defense
  7. N/A

    SBC: TRIDENT SYSTEMS LLC            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseOffice of the Secretary of Defense
  8. An Innovative, Java-Based Tool Suite for Visual Failure Management in Large-Scale, Complex, High Assurance Systems

    SBC: 21ST CENTURY SYSTEMS, INC.            Topic: N/A

    21st Century Systems, Inc. (2CSI, formed April 1996) proposes a tool suite which will combat architectural design errors in large-scale, high-assurance systems through systematic and intelligent simulation and modeling of alternate designs. The suite will feature a wide range failure analysis, identification, isolation, correction and management tools, and will make use of many innovative resourc ...

    SBIR Phase I 1998 Department of DefenseOffice of the Secretary of Defense
  9. CDL OPNET ANALYSIS SYSTEM

    SBC: Adroit Systems, Inc.            Topic: N/A

    The CDL Standard and associated channelization structure was established over 20 years ago and are not optimized for current networking technologies. As networking technologies are integrated into CDL and new sensors are deployed, the demand for CDL bandwidth is increasing. Specifically, the insertion of ATM into the CDL architecture has raised some issues concerning data integrity due to the hi ...

    SBIR Phase I 1998 Department of DefenseOffice of the Secretary of Defense
  10. Small Craft Vision Enhancement/Situation Awareness System

    SBC: A B TECHNOLOGIES, INC.            Topic: N/A

    A B technologies proposes to conduct advanced research leading to development of an enhanced Personal Visualization Environment (PVE) that will provide visualization of fused, multi-sensor, multi-spectral, image and non-image data from external sources. Our progress shows that a lightweight, eyeglass from factor having capabilities of full and partial transmissivity or full immersion virtual view ...

    SBIR Phase I 1998 Department of DefenseOffice of the Secretary of Defense
US Flag An Official Website of the United States Government