You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. HLA Federation Implementation Tools

    SBC: Aegis Technologies Group, LLC, The            Topic: N/A

    The Defense Modeling and Simulation Office (DMSO) has developed the High Level Architecture (HLA) as one of the principle components of a DoD-wide Common Technical Framework for modeling and simulation (M&S). Unlike previous distributed simulation technologies such as DIS and SIMNET, HLA provides federation developers, via the Object Model Template (OMT), the means to define the structure and for ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  2. Analysis and Improvement of Trivalent Chromium Conversion Coatings for Aluminum Alloys

    SBC: American Research Corporation of Virginia            Topic: N/A

    The trend toward replacement of highly toxic chemicals with less hazardous alternatives has created the demand for replacement of chromate conversion coatings for corrosion protection of aluminum alloys. Aluminum alloys are the predominate structural material used in aircraft because of their high strength-to-weight ratios, affordability and processability. Aluminum is subject to catastrophic fail ...

    SBIR Phase II 1997 Department of DefenseOffice of the Secretary of Defense
  3. Computer Enhanced Eddy Current Detection of Hidden Substructure Edges and Holes

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  4. Liquid Crystal-Based Underwater Imager

    SBC: EMPIRICAL TECHNOLOGIES CORPORATION            Topic: N/A

    The contractor proposes a new approach to underwater imaging that directly converts a two-dimmensional acoustic pressure wave into an electronic requirements fo convential piezo-element arrays. The imager relies on the piezo-birefringent properties of a nematic liquid crystal panel that serves as both sensor and display. The capability of nematic liquid crystals has been established and publishe ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  5. SMART SENSORS USING OPTICAL FIBER INTERCONNECTS AND DISTRIBUTED MEMS

    SBC: LUNA INNOVATIONS INCORPORATED            Topic: N/A

    This SBIR program would develop practical methods for the interconnection, addressing and control of large numbers of distributed MEMS-based sensing and actuation elements using optical fiber multiplexing techniques. Such interconnected sensor/actuator arrays have immediate and long-term applications in the instrumentation and control of adaptive aircraft, spacecraft and hydrocraft structures, fl ...

    SBIR Phase II 1997 Department of DefenseOffice of the Secretary of Defense
  6. Optical Fiber-Based Corrosion System Using Electrochemically Active Coatings

    SBC: LUNA INNOVATIONS INCORPORATED            Topic: N/A

    The objective of the proposed program is to address the high service costs of the current U.S. Navy fleet of aircraft by developing a distributed optical fiber sensor system that will help reduce the costs associated with corrosion damage and extend the lifetime of existing aircraft. Annual corrosion of Navy metallic structures has been estimated as high as $1 billion. Additional costs aris ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  7. Ionic Self-Assembled Organic/ Inorganic Nonparticle Coatings and Composites

    SBC: LUNA INNOVATIONS INCORPORATED            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  8. Water Quality Monitoring Device

    SBC: Gky And Associates, Inc.            Topic: N/A

    The research is to develop a sheet flow sampler to collect highway washoff and to operate in a highway roadside environment. The proposed sampler is expendable, simple, and cost effective. It will collect a predetermined depth of runoff (most commonly the first 1/2 inch of "first flush"), store it, and be removed and replaced by maintenance workers following rain events. The sampler will be its ...

    SBIR Phase II 1997 Department of Transportation
  9. Unobtrusive Eyelid Closure & Visual Point of Regard Measurement Device

    SBC: EYEGAZE INC            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  10. Parallel Optical Memory Interconnects

    SBC: LSA            Topic: N/A

    In this proposal, we describe a novel approach for realizing a parallel, nonmechical, read/write interconnection for angle-multiplexed three-dimensional (3-D) optical memories. Our concept represents a significant first step required toward taking this critical memory technology from the laboratory and inserting it into operational systems. The concept utilizes novel optomechanical packaging and ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
US Flag An Official Website of the United States Government