You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A CAD-Programmable Environment for Developing CBM Systems for Rotorcraft

    SBC: ADVANCED STRUCTURAL TECHNOLOGY, INC.            Topic: N/A

    The objective of the Phase II research is to utilize the lessons learned from the Phase I risk reduction work to develop a prototype CAD-programmable environment for the development of condition-based maintenance systems for rotorcraft. This developmentenvironment features a CAD scenario modeler for constructing, via click n' drag modeling, fault-to-failure damage models which can account for the ...

    SBIR Phase I 2003 Department of DefenseOffice of the Secretary of Defense
  2. N/A

    SBC: BARRON ASSOCIATES, INC.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseOffice of the Secretary of Defense
  3. N/A

    SBC: BEVILACQUA RESEARCH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseOffice of the Secretary of Defense
  4. N/A

    SBC: DOMINCA LLC            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseOffice of the Secretary of Defense
  5. N/A

    SBC: GMA INDUSTRIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseOffice of the Secretary of Defense
  6. N/A

    SBC: PLANNING SYSTEMS, INC.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseOffice of the Secretary of Defense
  7. N/A

    SBC: Research Development Corporation            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseOffice of the Secretary of Defense
  8. N/A

    SBC: TRIDENT SYSTEMS LLC            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseOffice of the Secretary of Defense
  9. 4h-Sic GTO Device Structural With Improved Reliability at High Blocking Voltage

    SBC: Intelligent Automation, Inc.            Topic: N/A

    Not Available Existing approaches to the detection of vehicles from SAR imagery are handicapped by a high false alarm rate, especially when used in high clutter environments such as urban areas and forested regions. In this Phase I proposal. Image Corp, Inc. proposes a system for SAR-based vehicle detection that makes extensive use of contextual information derived from the SAR image itself. Mu ...

    SBIR Phase I 1999 Department of DefenseOffice of the Secretary of Defense
  10. Breakdown Voltage Enhancement Through Lateral Vapor Phase Epitaxy

    SBC: INTRINSIC SEMICONDUCTOR CORP.            Topic: N/A

    Not Available In the course of developing the solar powered Pathfinder and Centurion high altitude long endurance (HALE) uninhabited air vehicles (UAVs), AeroVironment has done extensive investigations into the effects of atmospheric turbulence on this unusual class of aircraft. This investigation found that turbulent loads are the driving factor in the design of these vehicles. In particular, ...

    SBIR Phase I 1999 Department of DefenseOffice of the Secretary of Defense
US Flag An Official Website of the United States Government