You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. An RF Detection and Diagnostic Tool

    SBC: AEROASTRO, INC.            Topic: N/A

    A significant problem for stakeholders in large satellite systems is the difficulty in getting data about these systems when it is most needed - in orbit and during critical anomalous situations. Near-field diagnostic measurements - including visual andinfrared images and close-range RF measurements - would provide the tools necessary to examine the performance, anomalies, and failures of a targe ...

    SBIR Phase II 2003 Department of DefenseAir Force
  2. Reconfigurable Synthetic Jet Actuation for Closed-Loop Hingeless Flow Control

    SBC: AEROPROBE CORPORATION            Topic: N/A

    In this work, we propose to capitalize on our experience with controls, synthetic jet actuation, low order system modeling, and fluid dynamics in order to develop an integrated approach to hingeless flight control. We propose to develop a novel,distributed, hybrid and reconfigurable, synthetic jet actuator that will be capable, via real-time distributed sensing and actuator parameter control, of b ...

    SBIR Phase II 2003 Department of DefenseAir Force
  3. Micromachined Deformable Mirrors for Beam Control and Imaging Applications

    SBC: AGILOPTICS            Topic: N/A

    Micromachined deformable mirrors are being commercialized by the contractor and applied to DOD related projects due to their light weight, fast response, small size, and inexpensive fabrication costs. During Phase II, the contractor and university teamwill demonstrate a novel projection system incorporating a micromachined deformable mirror, and develop a complete adaptive optics system based upo ...

    STTR Phase II 2003 Department of DefenseAir Force
  4. Ultra Fast X-Ray Imaging Detector

    SBC: RADIATION MONITORING DEVICES, INC.            Topic: N/A

    to High speed x-ray imaging is extremely important for several military and civilian applications such as analyzing ballistic impacts, imaging exploding land mines, medical computed tomography, and non-destructive testing. A lack of high-resolutiondetection systems with large active imaging areas and a microsecond time resolution is currently the major limiting factor in these important applicati ...

    SBIR Phase II 2003 Department of DefenseAir Force
  5. Link 16 Gateway Phase II

    SBC: ALPHATECH, INC.            Topic: N/A

    The primary objective of this SBIR is to implement a proof-of-concept interoperability gateway based on a layered architectural design developed in Phase One. The goal is to demonstrate the viability of a layered translation architecture for developinginter-exchange gateways that must perform data translation from one medium to another and/or among several mediums. For example, with the mandated p ...

    SBIR Phase II 2003 Department of DefenseAir Force
  6. Machine Reasoning for Effects-Based Operations: A Generic Architecture for Multi-Domain Workarounds Reasoning

    SBC: ALPHATECH, INC.            Topic: N/A

    Effects-based operations must determine how the enemy might respond to air strikes. Current approaches to predicting enemy response to target damage suffer from serious limitations: they typically do not consider how the enemy might repair or modify thestructure of a target system, they typically reason only about a single type of target system, they cannot adequately represent action duration, c ...

    SBIR Phase II 2003 Department of DefenseAir Force
  7. Multi-Hypothesis Automated Wireframe Generation

    SBC: ALPHATECH, INC.            Topic: N/A

    High-accuracy standoff missile targeting systems such as JASSM require prominent geometric features for automatic target correlation. Three-dimensional wireframe models can precisely describe object boundaries (edges and corners) and are thus well-suitedrepresentations of fixed targets. The past two decades of computer vision research have seen considerable advances in wireframe construction from ...

    SBIR Phase II 2003 Department of DefenseAir Force
  8. SAR-to-HRR Feature Assoc and Change Detection for Move-Stop-Move Tracking

    SBC: ALPHATECH, INC.            Topic: N/A

    N/A

    SBIR Phase II 2003 Department of DefenseAir Force
  9. Opportunistic Sensor Resource Mgmt for Extended Op Cond

    SBC: ALPHATECH, INC.            Topic: N/A

    N/A

    SBIR Phase II 2003 Department of DefenseAir Force
  10. Profile Fusion for Active Sensor Management (PROFASM)

    SBC: ALPHATECH, INC.            Topic: N/A

    N/A

    SBIR Phase II 2003 Department of DefenseAir Force
US Flag An Official Website of the United States Government