You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Project 25 Mobile Radio Migration Platform for Homeland Security and Fire Management

    SBC: CATALYST COMMUNICATIONS TECHNOLOGIES, INC.            Topic: N/A

    Government mandates require federal agencies to purchase digital radios compliant with Project 25 standards, but these new radios do not work with the radios currently in use by the USFS. Significant audio degradation occurs when links are attempted between different radios from different manufacturers. Existing P25 solutions require expensive dedicated circuits and do not meet the needs of the US ...

    SBIR Phase II 2005 Department of Agriculture
  2. High Resolution Acoustic Groundwater Flow Monitor

    SBC: LUNA INNOVATIONS INCORPORATED            Topic: N/A

    Luna Innovations will develop an enabling new technology to determine groundwater vector flow between well sites using acoustic propagation. The new capability is derived from Luna's patented ultrasonic phase-locked-loop research that will be scaled to operate at seismic frequencies appropriate for groundwater monitoring. The instrument will operate from small well bores to assess the dynamic and ...

    SBIR Phase II 2005 Department of Agriculture
  3. Electrical Field-Enhanced Capacitive Transducers for Humidity and Moisture Control Systems

    SBC: Horizon Technology Group, Inc.            Topic: N/A

    Humidity and moisture are difficult parameters to measure and control in greenhouses and in bulk stored grain. Greenhouse control systems with distributed sensors can manage dynamic environments to enhance crop yield, prevent disease, and conserve energy. Psychrometers are too complex for multi-zone climate control. At high levels of humidity, hygrometers have problems with accuracy, stability, an ...

    SBIR Phase II 2005 Department of Agriculture
  4. Analysis and Improvement of Trivalent Chromium Conversion Coatings for Aluminum Alloys

    SBC: American Research Corporation of Virginia            Topic: N/A

    The trend toward replacement of highly toxic chemicals with less hazardous alternatives has created the demand for replacement of chromate conversion coatings for corrosion protection of aluminum alloys. Aluminum alloys are the predominate structural material used in aircraft because of their high strength-to-weight ratios, affordability and processability. Aluminum is subject to catastrophic fail ...

    SBIR Phase II 1997 Department of DefenseOffice of the Secretary of Defense
  5. SMART SENSORS USING OPTICAL FIBER INTERCONNECTS AND DISTRIBUTED MEMS

    SBC: LUNA INNOVATIONS INCORPORATED            Topic: N/A

    This SBIR program would develop practical methods for the interconnection, addressing and control of large numbers of distributed MEMS-based sensing and actuation elements using optical fiber multiplexing techniques. Such interconnected sensor/actuator arrays have immediate and long-term applications in the instrumentation and control of adaptive aircraft, spacecraft and hydrocraft structures, fl ...

    SBIR Phase II 1997 Department of DefenseOffice of the Secretary of Defense
  6. Digital Intelligence Situation Mapboard for Enhanced Situation Awareness

    SBC: TRIDENT SYSTEMS LLC            Topic: N/A

    Current battlefield situation displays either lack resolution ir restrict the user's perception to a small segment of the battlefield. Additionally, the plotting of data on these displays is extremely manpower-intensive, consuming valuable personnel resources that could be applied to situation analysis and other important tasks. Trident proposes to design and produce an innovative situation awar ...

    SBIR Phase II 1997 Department of DefenseOffice of the Secretary of Defense
  7. Remote Automated Atmospherics Monitoring and Prediction System

    SBC: North Dancer Labs, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of DefenseOffice of the Secretary of Defense
  8. Housing and Health Care for Rural Communities Using the Elder Care Housing Opportunities (ECHO) Approach

    SBC: The Glenn H. Woods Corp.            Topic: N/A

    Phase I of this SBIR proposal will study the feasibility of ECHO housing accompanied with Home Health Care insurance, as a revenue-generating opportunity for rural communities. The proposed objectives are summarized as follows: 1. To perform three needs assessments in the state of Vermont of homeowners 55 years old and over living in rural areas. To ascertain a. the feasibility of ECHO housing ...

    SBIR Phase II 1996 Department of Agriculture
  9. ONE-STEP INFLOW/OUTFLOW CELL TO DETERMINE SOIL HYDRAULIC PROPERTIES

    SBC: Daniel B. Stephens & Associates, Inc.            Topic: N/A

    THE RELATIONSHIP AMONG WATER POTENTIAL, HYDRAULIC CONDUCTIVITY, AND WATER CONTENT (P-K-O) ARE SOME OF THE MOST COMMONLY SOUGHT SOIL PHYSICAL PROPERTIES. PREDICTION OF WATER AND SOLUTE MOVEMENT IN BOTH AGRICULTURAL AND ENVIRONMENTAL SITUATIONS IS ULTIMATELY PREDICATED UPON AN ADEQUATE EXPERIMENTAL DESCRIPTION OF POROUS MEDIA. A RAPID AND ACCURATE METHOD TO DETERMINE THESE RELATIONSHIPS WOULD FIND W ...

    SBIR Phase II 1994 Department of Agriculture
  10. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC            Topic: N/A

    THE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government