You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. High Performance Piezoceramic Coatings for Ultrasound Applications

    SBC: Active Control eXperts, Inc.            Topic: N/A

    ACX proposes an innovative new process for the manufacture of smart structures using a High Velocity Oxy-Fuel (HVOF) thermal spray process. This simple, multi-step process will be capable of depositing electroded piezoceramic coatings. The coatings will be poled while still hot, reducing poling times and voltages while increasing poling efficiency. Process times will be extremely short. The pr ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  2. Electromagnetic Detection of Tornadoes

    SBC: Airborne Research Associates            Topic: N/A

    The ultimate objective of this project is to develop an instrument capable of remote detection and location of tornadoes and/or storms containing tornadoes. There are many reports, both scientific and anecdotal, suggesting that tornadoes and tornadic thunderstorms emit anomalous electromagnetic (EM) radiation-both RF and luminous. This radiation is characterized by unusually high rates of EM pulse ...

    SBIR Phase I 1997 Department of Commerce
  3. High Resolution Semiconductor Gamma Ray Detectors for Radionuclide Metrology

    SBC: RADIATION MONITORING DEVICES, INC.            Topic: N/A

    Quantitative, non-invasive X and gamma ray 3-D tomographic assessment of large, irregularly shaped, heterogeneous bodies is essential for efficient progress of environmental waste management. Currently, thousands of sealed containers with low-level radioactive waste are in storage. The material must be identified and quantified as a preliminary step to processing or storing the material. Curren ...

    SBIR Phase II 1997 Department of Commerce
  4. Analysis and Improvement of Trivalent Chromium Conversion Coatings for Aluminum Alloys

    SBC: American Research Corporation of Virginia            Topic: N/A

    The trend toward replacement of highly toxic chemicals with less hazardous alternatives has created the demand for replacement of chromate conversion coatings for corrosion protection of aluminum alloys. Aluminum alloys are the predominate structural material used in aircraft because of their high strength-to-weight ratios, affordability and processability. Aluminum is subject to catastrophic fail ...

    SBIR Phase II 1997 Department of DefenseOffice of the Secretary of Defense
  5. Computer Enhanced Eddy Current Detection of Hidden Substructure Edges and Holes

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  6. Process-Based Assurance Product Suite

    SBC: Arca Systems, Inc.            Topic: N/A

    Arca proposes research leading to development of a suite of methodology support products to help meet the need for innovative assurance techniques appropriate for emerging information technologies. The product will consist of a licensable methodology and supporting materials for specifying, building, and evaluating assurance arguments for products and systems based on the capability of security en ...

    SBIR Phase I 1997 Department of Commerce
  7. Algorithms for Health Care Quality Management and Outcomes Assessment

    SBC: BARRON ASSOCIATES, INC.            Topic: N/A

    American health care is in the midst of momentous change. Quality improvement principles are being used increasingly to enhance productivity and efficiency of health care delivery and to help contain costs. In producing patient outcomes and resource utilization measures, it is vital to control appropriately for case mix (i.e., differences in patients due, e.g., to illness severity) in the predicti ...

    SBIR Phase I 1997 Department of Commerce
  8. A Five Volt Lithium Battery

    SBC: COVALENT ASSOC., INC.            Topic: N/A

    In this Phase I SBIR program we propose to develop a novel high voltage (5V) lithium-ion battery suitable for portable electronics equipmentand transportation applications. Lithium-ion batteries are already commercially available and typically consist of carbon anode, non-aqueous electrolyte and lithium transition metal oxide cathode such as LiCoO2, LiNiO2 or LiMnO4. These systems have an operat ...

    SBIR Phase II 1997 Department of DefenseOffice of the Secretary of Defense
  9. A High Temperature Fiber Optic Raman Probe for Corrosion and Process Monitoring

    SBC: EIC LABORATORIES, INC.            Topic: N/A

    The ability to monitor the progress of chemical reactions and to detect the presence of corrosive constituents is a challenge in the emerging field of hydrothermal oxidation (HTO) reactors. Likewise, there is also a need to monitor crevice corrosion in commercial steam-generation boilers because corrosion undermines the integrity of steam generators and therefore impacts the operating cost and re ...

    SBIR Phase II 1997 Department of Commerce
  10. Hand Held High Resolution Imagin Devices for Aircraft Substructures

    SBC: Eikos, Inc.            Topic: N/A

    Eikos LLC will evaluate two approaches, millimeter waves and opto-acoustics, for locating edges and holes in substructure that are hidden under exterior panels and skins during aircraft assembly. These devices will work in a camera-like fashion to allow non-destructive remote imaging. Eikos has developed promising approaches to both techniques that have the potential to be low cost and easy to u ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
US Flag An Official Website of the United States Government