You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Inservice Diagnostics of Motor Operated Valves

    SBC: ACENTECH INCORPORATED            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  2. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC            Topic: N/A

    THE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  3. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  4. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    THIS PROJECT IS AIMED AT DEVELOPING TECHNIQUES FOR PREDICTING CHECK VALVE PERFORMANCE AND ITS INTERNAL COMPONENTS DEGRADATION IN PRACTICAL PIPING SYSTEMS USED IN NUCLEAR POWER PLANTS. THE MAIN FOCUS OF THE EFFORT IS TO SYSTEMATICALLY EVALUATE THE EFFECT OF UPSTREAM DISTURBANCES WHICH ARE WITHIN 10 DIAMETERS UPSTREAM. BY USING A COMBINED THEORETICAL AND EXPERIMENTAL APPROACH, GENERALIZED NONDIMENSI ...

    SBIR Phase II 1988 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government