You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. Portable Electronic Device Detector

    SBC: Megawave Corporation            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  2. Transit Fare Collection Decision Models for Fare Policy & Cost Analysis

    SBC: Multisystems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  3. Development of Breakaway Guy Wires for Utility Poles

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  4. Feasibility of Vehicle Borne Detection of Broken Rail

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  5. A New Optical Traffic Monitor

    SBC: Science Research Laboratory, Inc            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  6. Innovative Solutions to Improve Performance of Railroad Switch Frogs & Turnouts

    SBC: Sharma & Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  7. Conceptual Design of a 'Tri-Coupler' System

    SBC: Sharma & Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  8. Chemical-Free Deicing- A Systems Approach

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    This proposal describes an innovative approach to non-chemical deicing of aircraft which focuses on new technology which could provide revolutionary improvement in the performance of a relatively mature deicing technique. This combined systems approach could be readily incorporated into existing aircraft and ground support equipment. We propose to develop a permanent anti-icing surface treatment ...

    SBIR Phase I 1996 Department of Transportation
  9. Response-Based Parameter Estimation for Determining Unknown Bridge Foundations

    SBC: Infrasense, Inc.            Topic: N/A

    Evaluation of bridges for vulnerability to scour or other potential sources of damage requires knowledge of foundation conditions beneath piers and abutments that are often unknown. INFRASENSE proposed to develop and demonstrate a response-based parameter estimation method (RPEM) which will address the need for a simple, low-cost system for unknown foundation evaluation. The RPEM system is based ...

    SBIR Phase I 1996 Department of Transportation
  10. MWM-Array Characterization of Widespread Fatigue Damage Onset

    SBC: Jentek Sensors, Inc.            Topic: N/A

    This proposal will investigate the potential of an enhanced version of the Meandering Winding Magnetometer (MWM), called the MWM-Array, to characterize and predict remaining life for components experiencing widespread fatigue damage. The MWM has already demonstrated the potential to characterize fatigue damage in metals priod to the formation of cracks, as well as the ability to detect and charac ...

    SBIR Phase I 1996 Department of Transportation
US Flag An Official Website of the United States Government