You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Self-Monitoring Surveillance System for Prestressing Tendons
SBC: Construction Technology Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
Development of a Performance Assessment Process Controller
SBC: Innovative Tech. Solutions Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
Inservice Diagnostics of Motor Operated Valves
SBC: ACENTECH INCORPORATED Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
ENHANCED REMOVAL OF RADIOACTIVE PARTICLES BY FLUOROCARBON SURFACTANT SOLUTIONS
SBC: Entropic Systems, Inc. Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
ENHANCEMENT TO STEAM GENERATOR TUBING EDDY CURRENT INSPECTION BY APPLICATION OF THERMALLY INDUCED STRESSES
SBC: FOSTER-MILLER, INC. Topic: N/ASTEAM GENERATOR TUBES REPRESENT A UNIQUE PART OF THE REACTOR COOLANT SYSTEM (RCS). LEAKAGE FROM ANY OTHER PART OF THE RCS IS CAPTURED BY THE CONTAINMENT BUILDING, BUT STEAM GENERATOR TUBE LEAKAGE IS TRANSPORTED OUT OF THE CONTAINMENT BUILDING ALONG WITH THE STEAM, WHICH IS NORMALLY UNCONTAMINATED. STEAM GENERATOR TUBES, CONSEQUENTLY, DESERVE, AND RECEIVE SPECIAL CONSIDERATION. THE ASSURANCE OF STE ...
SBIR Phase I 1992 Nuclear Regulatory Commission -
NONDESTRUCTIVE EXAMINATION TO DIRECTLY MEASURE STEAM GENERATOR TUBE U-BEND VIBRATORY RESPONSE
SBC: FOSTER-MILLER, INC. Topic: N/AON FEBRUARY 9, 1991, AT THE MIHAMA UNIT 2 NUCLEAR POWER STATION, OPEARTED BY KANSAI ELECTRIC CORPORATION, A STEAM GENERATOR TUBE RUPTURED AND RELEASED APPROXIMATELY 9,000 GALLONS OF REACTOR COOLANT INTO THE SECONDARY SYSTEM. THE LEAKAGE CAUSED A RAPID DEPRESSURIZATION OF THE REACTOR COOLANT SYSTEM, WHICH RESULTED IN AN AUTOMATIC REACTOR TRIP AND ACTUATION OF THE HIGH PRESSURE SAFETY INJECTION SYST ...
SBIR Phase I 1992 Nuclear Regulatory Commission -
MEASUREMENT OF RESIDUAL RADIOACTIVE CONTAMINATION BY 2-D LASER HEATED TLD
SBC: International Sensor Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
DETECTION OF INCIPIENT CORROSION IN NUCLEAR POWER PLANTS
SBC: MASSACHUSETTS TECHNOLOGICAL LABORATORY Topic: N/AACOUSTIC FIELDS CAN BE DESIGNED TO COAX LIQUID BORNE SUBMICRONIC PARTICLES TO ANNOUNCE THEIR PRESENCE LOUDER THAN THE USUAL SCATTERING SIGNALS WHICH ARE PRIMARILY DETERMINED BY THE DENSITY AND COMPRESSIBILITY CONTRAST BETWEEN THE PARTICLE MATERIAL AND THE HOST FLUID. WE EXPECT A SIGNAL ENHANCEMENT OF AT LEAST 60DB. THE KEY CONCEPT IS TO COAX THE PARTICLES TO SOFT CAVITATE AND DETECT THE ENSUING TR ...
SBIR Phase I 1992 Nuclear Regulatory Commission -
A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS
SBC: TPL, INC Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS
SBC: Risk Management Systems Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission