You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Intelligent Agent Toolset for 4D/RCS Architectures

    SBC: 21ST CENTURY SYSTEMS, INC.            Topic: N/A

    There is an increasing demand for systems with more autonomous operations interacting with other autonomous and human-based systems. What is needed is an architecture bundled with developer tools for the creation of intelligent real-time control systems that marry the talents of modern control theory, software technology, sensory processing, and semantic knowledge representations. It would be a st ...

    SBIR Phase I 2006 Department of CommerceNational Institute of Standards and Technology
  2. Multi-user Collaborative Tools for Immersive Scientific Visualization

    SBC: OPEN TECH, INC.            Topic: N/A

    Open Tech will create an interactive multi-user collaboration product for immersive and desktop scientific visualization. This product will leverage our Virtual Reality Windowing Library to enable an easy to use collaboration interface that includes user lists, radars, maps, avatars, white boards, and virtual presentations. The product will also contain a software framework that enables developers ...

    SBIR Phase II 2006 Department of CommerceNational Institute of Standards and Technology
  3. Improved Water Level Measurement System

    SBC: Sutron Corporation            Topic: 8311

    This project provides a preliminary design and specifications for a Data Collection Platform with Interrogate (DCPI) capability using DS-CDMA RF transmission techniques. Sutron shall develop a sample link budget for the DCPI link and model its performance. A protocol will then be designed that will allow maximum flexibility in the communications with the DCP. A prototype will be developed to ex ...

    SBIR Phase I 2006 Department of Commerce
  4. Improved Water Level Measurement System

    SBC: Sutron Corporation            Topic: 842

    This project provides an improved design for the dual-orifice bubble gauge for water level observations in cold regions. The improvements consist of using optimized true-differential sensors and specialized processing to improve the accuracy, particularly in the presence of water waves. The prototype will be designed based on a numerical model of the dual-orifice gauge that includes the time-dep ...

    SBIR Phase I 2006 Department of Commerce
  5. Process-Based Assurance Product Suite

    SBC: Arca Systems, Inc.            Topic: N/A

    Arca proposes research leading to development of a suite of methodology support products to help meet the need for innovative assurance techniques appropriate for emerging information technologies. The product will consist of a licensable methodology and supporting materials for specifying, building, and evaluating assurance arguments for products and systems based on the capability of security en ...

    SBIR Phase I 1997 Department of Commerce
  6. Algorithms for Health Care Quality Management and Outcomes Assessment

    SBC: BARRON ASSOCIATES, INC.            Topic: N/A

    American health care is in the midst of momentous change. Quality improvement principles are being used increasingly to enhance productivity and efficiency of health care delivery and to help contain costs. In producing patient outcomes and resource utilization measures, it is vital to control appropriately for case mix (i.e., differences in patients due, e.g., to illness severity) in the predicti ...

    SBIR Phase I 1997 Department of Commerce
  7. A Ruggedized System for Measuring Extreme Winds

    SBC: Caregiver Technologies, Inc.            Topic: N/A

    We will develop technology, termed a Ruggedized Wind Measurement System (RWMS), to measure directly extreme winds with high space and time resolution, focusing on the winds that occur beneath hurricanes at land fall. This development effort will include design, fabrication of two prototype RWMS units, and a series of proof-of-concept demonstrations in strong mountain-induced downslope and severe t ...

    SBIR Phase I 1997 Department of Commerce
  8. Analysis Software for Near-Field Optical Microscopes

    SBC: Field Precision            Topic: N/A

    The near-field scanning optical microscope can supply information on the shape and electrical properties of surfaces with nanometer resolution. The quantitative interpretation of images is difficult because of the difficulty of electromagnetic field solutions in the near-field limit. We propose to supply software to aid in this analysis. The finite-element programs generate two and three-dimension ...

    SBIR Phase I 1997 Department of Commerce
  9. New Methods for Evaluating Thermal Performance of Protective Clothing for

    SBC: KTECH CORP.            Topic: N/A

    A growing number of fire fighters are suffering third degree burns; this has led to questions about the adequacy of thermal protective performance (TPP) measurements for protective clothing. A new heat flux sensor, whose response approximates that of skin, will be developed to provide better measurements of heat transfer in TPP tests. This sensor will be used with nonlinear parameter estimation an ...

    SBIR Phase I 1997 Department of Commerce
  10. Thermographic Phosphor Based Heat Flux Sensors

    SBC: KTECH CORP.            Topic: N/A

    As fire protection engineering moves towards the implementation of performance- based fire codes, the use of validated fire models is becoming a necessity. Part of the validation process involves demonstrating model capabilities for predicting key fire environment parameters. One of the key parameters for estimating time to ignition and fire growth is the heat transfer rate to compartment surfaces ...

    SBIR Phase I 1997 Department of Commerce
US Flag An Official Website of the United States Government