You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. RF Viper System for Wrong-Way Drivers

    SBC: RS International, LLC            Topic: 20FH1

    RF Viper is a novel next generation system to stop wrong-way drivers (WWD) on ramps. It is the “vehicle-to- infrastructure” missing component of the current Alert & Warning systems installed in many states. Like a true viper that uses its fangs to inject venom and incapacitate its prey, the RF Viper emits energy that interrupts vehicle engine electronics, stops the engine, incapacitating the v ...

    SBIR Phase I 2020 Department of Transportation
  2. ADVANCING BATHYMETRY AND STREAMFLOW SURVEY TO REAL-TIME SCOUR PREDICTION: AN AUTOMATED ALGORITHM

    SBC: Genex Systems LLC            Topic: 20FH3

    Most research on scour assessment has traditionally focused on developing best-fit or envelope equations to estimate the maximum scour depths from physical experiments in a laboratory environment. However, obtaining an accurate estimate is always a challenge due to numerous uncertainties in the actual riverine or coastal environment. With advances in new surveying technologies and growing computat ...

    SBIR Phase I 2020 Department of Transportation
  3. Modular Lightweight Composite Deck

    SBC: PRECAST SYSTEMS ENGINEERING, LLC            Topic: 20FH2

    A newly proposed combination of high-strength weathering steel sheet with Ultra-High Performance Concrete (UHPC) to leverage the benefits of both emerging technologies. The combined system offers benefits over traditional orthotropic steel decks and existing concrete or UHPC deck solutions, both of which offer high up-front costs in fabrication or forming. The resulting composite structure provide ...

    SBIR Phase I 2020 Department of Transportation
  4. Managing Geohazards- Quantitative Risk Assessment for Pipelines

    SBC: APPLIED ENGINEERING MANAGEMENT CORPORATION            Topic: 20PH3

    This Small Business Innovation Research (SBIR) Phase I project will investigate the value of a quantitative risk assessment tool for management of geohazard threats to pipelines.Phase I will determine data sources for quantitative risk assessment to support management and decision-making needs of pipeline industry stakeholders; identify the potential market for such a tool; identify a study locati ...

    SBIR Phase I 2020 Department of Transportation
  5. MWM Array Bending Stress and Crack Detection In-Line Inspection Module

    SBC: JENTEK SENSORS, INC.            Topic: 20PH1

    In-line inspection (ILI) is a cornerstone for pipeline integrity. Advances to ILI tools are essential to maintaining pipeline safety. Gaps exist for the detection of circumferential cracking (at and away from welds and dents) and bending stresses. Few technologies exist that can make reputable claims for stress measurement that are non-destructive, reliable, and appropriate for integration onto an ...

    SBIR Phase I 2020 Department of Transportation
  6. No-Dig Point Repair Technology for Steel O&G Pipelines

    SBC: Quakewrap, Inc.            Topic: 20PH2

    PHMSA reports a total of 5,745 pipeline incidents with 282 deaths and 1,193 injuries in the 20-year period from 2000 through 2019. Moreover, these incidents cost $10,419,311,449 in damages. Most oil and gas (O&G) transmission pipes are repaired externally by excavating around a damaged or leak site, preparing the pipe surface, and mechanically installing a repair product such as a clamp or wrap on ...

    SBIR Phase I 2020 Department of Transportation
  7. Sensor Enhanced Mobile Aggregate Evaluation using Computer Vision

    SBC: MICHAEL SANCHEZ            Topic: 20FR4

    Crushed aggregates play an important role in the safe and reliable operation of our nation’s railroad infrastructure.Over time, aggregates become fouled by finer particles, and if not monitored and remedied, this fouling can lead to catastrophic accidents such as train derailments.A handheld inspection system that can accurately perform a quantitative measure of aggregate gradation and degree of ...

    SBIR Phase I 2020 Department of Transportation
  8. Highway Induction Paint to Enable Safety Messaging

    SBC: NANOSONIC INC.            Topic: 190FH1

    The objective of the proposed Phase I Department of Transportation/Federal Highway Administration SBIR program is to develop a sprayable highway paint to communicate vehicle-to-everything (V2X) safety messages between infrastructure, vehicles and pedestrians. During Phase I, NanoSonic will work with Virginia Tech antenna designers and the Virginia Tech Transportation Institute (VTTI) to design and ...

    SBIR Phase I 2020 Department of Transportation
  9. Ionic Self-Assembled Organic/ Inorganic Nonparticle Coatings and Composites

    SBC: LUNA INNOVATIONS INCORPORATED            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  10. Unobtrusive Eyelid Closure & Visual Point of Regard Measurement Device

    SBC: EYEGAZE INC            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
US Flag An Official Website of the United States Government