You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Structured Waveform, Magnetic Field (SWMF) PIG Development for Cracks and Corrosion

    SBC: JENTEK SENSORS, INC.            Topic: 132PH1

    Multiple major pipeline failures have been caused by seam weld defects not detected by available ILI technology [August 16, 2013 WSJ]. Phase I will demonstrate a game changing capability to deliver internal and external corrosion mapping and seam weld crack detection in a low-cost tool that “encourages more repetitive ILI runs and wider use.” JENTEK’s new through wall imaging method called S ...

    SBIR Phase I 2014 Department of Transportation
  2. Development of Middle School and High School STEM Programs in ITS and CV Technologies

    SBC: NANOSONIC INC.            Topic: 141FH4

    NanoSonic will work with the Giles County, Virginia,school system,and Leidos, a developer of ITS NanoSonic will work with the Giles County, Virginia,school system,and Leidos,a developer of ITS and CV technologies,to create and deliver a set of STEM lesson plans involving ITS and CV concepts. With Leidos transportation engineers, NanoSonic will identify project ideas,and with Giles County STEM teac ...

    SBIR Phase I 2014 Department of Transportation
  3. In-situ Sensors for Cathodic Protection Interrelationships Modeling

    SBC: SENCONTROLOGY, INC.            Topic: 132PH2

    To adequately protect underground pipelines, a coating (including polyurethane foams) must conduct CP current when disbondment occurs. The realization of a reliable, multi-functional process/material system that can ensure urethane foams not only perform in harmony with CP, but establishing the worthiness of their continued use would be of major benefit to the national transportation system. Senc ...

    SBIR Phase I 2014 Department of Transportation
  4. Mid-chord Rail Offset Measurement Systems (McROMS)

    SBC: TECHNICAL PRODUCTS INC            Topic: 141FR1

    What is needed is a lightweight system that can be deployed and used by one person that will measure and compile the track geometry data and compute the MCO for a rail section in real time without reliance on any external reference. Such a device, the Mid-chord Rail Offset Measurement System (McROMS) is the subject of this proposal. But MCO is not the only rail geometry data of interest. If this s ...

    SBIR Phase I 2014 Department of Transportation
  5. Integrated Tracking and Guidance (I-TAG) System for Trenchless Utility Relocation

    SBC: White River Technologies Inc            Topic: 141FH3

    Trenchless excavation methods, such as horizontal directional drilling (HDD) operations, offer the potential for significant cost savings on many utility relocation projects; however, these methods require extremely accurate drill head navigation in addition to precise knowledge of existing utility location in order to ensure boring operations do not interfere with existing pipelines or conduits. ...

    SBIR Phase I 2014 Department of Transportation
  6. Ionic Self-Assembled Organic/ Inorganic Nonparticle Coatings and Composites

    SBC: LUNA INNOVATIONS INCORPORATED            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  7. Unobtrusive Eyelid Closure & Visual Point of Regard Measurement Device

    SBC: EYEGAZE INC            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  8. Portable Electronic Device Detector

    SBC: Megawave Corporation            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  9. Transit Fare Collection Decision Models for Fare Policy & Cost Analysis

    SBC: Multisystems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  10. Development of Breakaway Guy Wires for Utility Poles

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
US Flag An Official Website of the United States Government