You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Low-Cost Fiber Optic Network Reflectometer

    SBC: Ax Instruments LLC            Topic: 01c

    To support large scale Fiber Optic (FO) network deployment, there is an identified industry need for a low cost, optical network reflectometer with high resolution and much lower cost to be used in the maintenance of FO networks. This technology supports new FO networks that are being installed in neighborhoods, office buildings, fibertothehome, local area networks, small office/home office (SOHO ...

    SBIR Phase I 2012 Department of Energy
  2. Low Cost Silicon Carbide Fibers, Tapes, and Architecture for Accident Tolerant Nuclear Fuel Cladding and Components

    SBC: CERAMIC TUBULAR PRODUCTS, LLC            Topic: 21b

    Since the Fukushima accident, the DOE, nuclear fuel suppliers, and EPRI, have begun to focus R & amp;D efforts on advanced LWR fuel and components that are more accident tolerant than current zirconium alloys. One area of interest are fuels and components fabricated from ceramic composites that do not balloon during LOCA accidents, do not react exothermically with water during post LOCA quench, an ...

    SBIR Phase I 2012 Department of Energy
  3. High-yield Production of Fumarate from Cellulosic Biomass by Recombinant Cellulolytic Bacillus subtilis

    SBC: Gate Fuels Incorporated            Topic: 17a

    This project will provide a low-cost route for high-yield fumarate production from pretreated non-food cellulosic biomass mediated by recombinant cellulolytic Bacillus subtilis. The cellulose fraction of biomass feedstock contains more than one half oxygen by weight, making it a good starting material for the production of oxygen-containing polymeric monomers. Fumaric acid or fumarate, among the D ...

    SBIR Phase I 2012 Department of Energy
  4. 15 kV Phase Leg Modules with SiC Monolithically Integrated JBS Rectifier with Super Junction Transistor (MIDSJT) Devices

    SBC: GENESIC SEMICONDUCTOR INC.            Topic: 08b

    This project will create a new category of advanced power modules for use in power electronics for energy storage in the medium-voltage range and & gt; 100 kW ratings. A design showing a significant increase in circuit efficiency, cost reduction, an increase in power density, and a reduction in thermal management requirements over the existing Silicon power modules will eliminate significant waste ...

    SBIR Phase I 2012 Department of Energy
  5. Next Generation Processes for Carbonate Electrolytes for Battery Applications

    SBC: MATERIALS MODIFICATIONS INC            Topic: 09c

    Dimethyl carbonate (DMC) is a promising electrolyte solvent for lithium battery applications due to its inherent safety and robustness. Despite the enormous promise of its industrial use, this chemical is currently entirely imported from China. Indigenous manufacture of DMC will enormously benefit not only the American lithium battery industry but also other industrial processes that us ...

    SBIR Phase I 2012 Department of Energy
  6. New Solvent system for Carbon Dioxide Capture

    SBC: MATERIALS MODIFICATIONS INC            Topic: 17a

    Reducing CO2 emissions from flue gas has become an increasingly important concern as large emissions have resulted in global climate change and a significant increase in global warming commonly known as the greenhouse effect. The state-of-the-art amine absorption process for CO2 removal has several disadvantages such as the high energy requirement for solvent regeneration, mass loss through evapor ...

    SBIR Phase I 2012 Department of Energy
  7. Scalable Network of Low-Cost, Self-Powered Wireless Sensors For Commercial Buildings

    SBC: MicroStrain, Inc.            Topic: 09a

    Conventional indoor environmental monitoring technologies are expensive, cumbersome to install and maintain, and do not provide the distributed granularity required to capture the necessary details for efficient energy management of commercial buildings. Developments in wireless sensor networks (WSN) provide substantial framework for monitoring and addressing indoor environments at scale. However ...

    SBIR Phase I 2012 Department of Energy
  8. Real time PV Manufacturing Diagnostic System

    SBC: MICROXACT INC.            Topic: 10e

    The main obstacle Photovoltaic (PV) industry is facing at present is the higher cost of PV energy compared to that of fossil energy. While solar cell efficiencies continue to make incremental gains these improvements are so far insufficient to drive PV costs down to match that of fossil energy. Improved in-line diagnostics however, has the potential to significantly increase the productivity and ...

    SBIR Phase I 2012 Department of Energy
  9. Advanced Filtration to Improve Single Crystal Casting Yield

    SBC: Mikro Systems, Inc.            Topic: 18a

    Mikro Systems Inc. (Mikro) has developed an advanced manufacturing platform called Tomo Lithographic Molding (TOMO). The platform has been successfully applied to produce highly engineered products, including turbine airfoils for power generation and aviation flight. Specifically, TOMO is currently being used to produce ceramic cores for investment casting of advanced turbine blades and vanes. Thi ...

    SBIR Phase I 2012 Department of Energy
  10. High Brightness Superconducting RF Photo Injector Gun Cavity

    SBC: MUPLUS INC.            Topic: 11a

    Next generation electron accelerators for research, medical, defense or industrial use are in need of electron sources operating at high repetition rates of 1 MHz and beyond, with normalized emittance of 1 mm-mrad or less and bunch charge as much as one nC or more. In Phase I we will numerically optimize a superconducting (niobium) RF photo injector gun cavity (SRF gun), which can provide unpreced ...

    SBIR Phase I 2012 Department of Energy
US Flag An Official Website of the United States Government