You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Low Power and Real-Time Oxygen Optrode

    SBC: Nanomaterials Research LLC            Topic: N/A

    Molecular oxygen is the most critical participant in respiratory pr ocess. Adequate oxygen supply is essential for the survivals of all living species. Fast, reliable and real-time measurement of oxygen concentration (partial pressure) is of great importance in assessing the health status of a person/soldier and the timely caring of critically ill patients. Presently available oxygen sensors suf ...

    SBIR Phase I 1997 Department of DefenseSpecial Operations Command
  2. Multiple-ping High Resolution Minehunting Sonar for High Speed, Wide Area Searches

    SBC: Datasonics, Inc.            Topic: N/A

    There is a requirement for a seafloor mapping system that will provide high resolution imagery in very shallow water when rigidly mounted to a 24 foot boat that is advancing at up to 10 knots. In this Phase I effort we propose to determine the feasibility of meeting this requirement with a prototype multiple-ping chirp side-scan sonar to operate at high frequencies and high ping rates, where multi ...

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
  3. Acoustic Pressure Gradient Imager For Divers

    SBC: EMPIRICAL TECHNOLOGIES CORPORATION            Topic: N/A

    The contractor has patented technology for a unique process that directly converts a two-dimensional acoustic disturbance, such as a wave front, into an intensity-mapped visible image in real-time without electronic circuitry; that is, it is a direct pressure gradient imager. The imager relies on the piezo-dichroic properties of a continuous layer of a dichroic material thin film that serves as bo ...

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
  4. A HIGH RESOLUTION CDTE ARRAY MONITORING SYSTEM FOR MONITORING CONTAMINATION IN SOILS

    SBC: Radiation Safety Engineering, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  5. Electromagnetic Pulse Mine Countermeasure Device

    SBC: Vail Research & Technology            Topic: N/A

    Naval Special Warfare is developing and testing equipment and tactics for neutralization of anti-invasion mines in the very shallow water maritime environment. The device proposed herein, an electromagnetic pulse mine countermeasure device, will enhance the capability of Naval Special Warfare to neutralize mines. The proposed device is expected to be effective against most, if not all, mine types, ...

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
  6. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  7. ENHANCED REMOVAL OF RADIOACTIVE PARTICLES BY FLUOROCARBON SURFACTANT SOLUTIONS

    SBC: Entropic Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  8. ENHANCEMENT TO STEAM GENERATOR TUBING EDDY CURRENT INSPECTION BY APPLICATION OF THERMALLY INDUCED STRESSES

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    STEAM GENERATOR TUBES REPRESENT A UNIQUE PART OF THE REACTOR COOLANT SYSTEM (RCS). LEAKAGE FROM ANY OTHER PART OF THE RCS IS CAPTURED BY THE CONTAINMENT BUILDING, BUT STEAM GENERATOR TUBE LEAKAGE IS TRANSPORTED OUT OF THE CONTAINMENT BUILDING ALONG WITH THE STEAM, WHICH IS NORMALLY UNCONTAMINATED. STEAM GENERATOR TUBES, CONSEQUENTLY, DESERVE, AND RECEIVE SPECIAL CONSIDERATION. THE ASSURANCE OF STE ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  9. NONDESTRUCTIVE EXAMINATION TO DIRECTLY MEASURE STEAM GENERATOR TUBE U-BEND VIBRATORY RESPONSE

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    ON FEBRUARY 9, 1991, AT THE MIHAMA UNIT 2 NUCLEAR POWER STATION, OPEARTED BY KANSAI ELECTRIC CORPORATION, A STEAM GENERATOR TUBE RUPTURED AND RELEASED APPROXIMATELY 9,000 GALLONS OF REACTOR COOLANT INTO THE SECONDARY SYSTEM. THE LEAKAGE CAUSED A RAPID DEPRESSURIZATION OF THE REACTOR COOLANT SYSTEM, WHICH RESULTED IN AN AUTOMATIC REACTOR TRIP AND ACTUATION OF THE HIGH PRESSURE SAFETY INJECTION SYST ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  10. DETECTION OF INCIPIENT CORROSION IN NUCLEAR POWER PLANTS

    SBC: MASSACHUSETTS TECHNOLOGICAL LABORATORY            Topic: N/A

    ACOUSTIC FIELDS CAN BE DESIGNED TO COAX LIQUID BORNE SUBMICRONIC PARTICLES TO ANNOUNCE THEIR PRESENCE LOUDER THAN THE USUAL SCATTERING SIGNALS WHICH ARE PRIMARILY DETERMINED BY THE DENSITY AND COMPRESSIBILITY CONTRAST BETWEEN THE PARTICLE MATERIAL AND THE HOST FLUID. WE EXPECT A SIGNAL ENHANCEMENT OF AT LEAST 60DB. THE KEY CONCEPT IS TO COAX THE PARTICLES TO SOFT CAVITATE AND DETECT THE ENSUING TR ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government