You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
High Pressure Compacted Non-Eroding Throats for Controllable Axial Upper Stages
SBC: Utron Kinetics LLC Topic: MDA08007In response to MDA’s needs for non-eroding throats for controllable axial upper stages , UTRON proposes an innovative near net shape fabrication technology called High Pressure Combustion Driven Powder Compaction (CDC) with tremendous potential for cost-effective manufacturing of advanced cermet type of alloys of ceramics such as micro/nano HfC, HfB2, HfN, ZrC and/or with high temperature ductil ...
SBIR Phase I 2009 Department of DefenseMissile Defense Agency -
Space Qualified, Fast Steering Mirror (SQ_FSM)
SBC: A-TECH CORPORATION Topic: MDA08011Many fast steering mirrors (FSM) have been developed over the years, but there has never been one specifically designed for long-term operation in a high radiation, cryogenic space environment. The Missile Defense Agency (MDA), to support the continuing development of the Space Tracking and Surveillance System (STSS), is seeking the development of this mirror to support future high-resolution line ...
SBIR Phase I 2009 Department of DefenseMissile Defense Agency -
Wideband Sub-Array Digital Receiver Exciter (DREX) Development and Packaging
SBC: AZURE SUMMIT TECHNOLOGY, INC. Topic: MDA08028Next generation Radars (NGR) for MDA will advance closer to the ideal of a fully digitized array and digital beamforming. In a conventional phased array radar (PAR), analog beamforming networks reduce the entire array into a few combined beams (e.g., sum beam, difference beams) at X-band. Next generation PAR will use a hybrid approach, forming many subarray beams in analog, and then performing a ...
SBIR Phase I 2009 Department of DefenseMissile Defense Agency -
Integrated UV/VIS/IR background phenomenology models for radiation transport system trades
SBC: COMPUTATIONAL PHYSICS, INC. Topic: MDA08032Computational Physics, Inc. (CPI) proposes to develop prototype first-principle cloud and terrain physics models integrated into a robust and extensible component architecture that facilitates the assessment of the impact of terrain and cloud radiance and irradiance in the UV/VIS/IR wavebands on missile defense systems. The prototype will also be used to demonstrate support for observational forec ...
SBIR Phase I 2009 Department of DefenseMissile Defense Agency -
Discrimination
SBC: DECISIVE ANALYTICS CORPORATION Topic: MDA08039The performance of the Ballistic Missile Defense System depends on a number of factors; one of the most important is the ability to accurately and efficiently discriminate between threats (reentry vehicles) and non-threats (decoys). The DECISIVE ANALYTICS Corporation (DAC) team proposes to develop a discrimination system based on a novel machine learning algorithm called Maximum Variance Unfoldin ...
SBIR Phase I 2009 Department of DefenseMissile Defense Agency -
Signature Prediction and Uncertainty Analysis for Radar-based MDA Applications
SBC: JIN CONSULTING, INC. Topic: MDA08035The objectives of this proposal are to develop and demonstrate a novel physics-based computational electromagnetics (CEM) algorithm for accurate and efficient predication of radar signatures of MDA objects of interest (MOIs) and to implement and demonstrate a robust stochastic collocation-based algorithm for efficiently quantifying the effect of geometrical and material uncertainties on the signat ...
SBIR Phase I 2009 Department of DefenseMissile Defense Agency -
Compact High Power Microwave Payloads
SBC: KTECH CORP. Topic: MDA08047The overall objective of this proposal is to develop the necessary components and to design and build a compact pulsed power system for the Missile Defense Agency that will produce little or no debris when activated. In particular, the energy requirements for the HPM payload appear to require an explosive-driven magnetic flux compression generator or one of it derivatives to provide the energy re ...
SBIR Phase I 2009 Department of DefenseMissile Defense Agency -
Sentient Connectors for Enhanced, Integration, Test, and Mission Assurance
SBC: MANAGEMENT SCIENCES INC Topic: MDA08001The MDA SBIR organization encourages exploiting of technologies to meet critical requirements. MSI, working with Deutsch, a leading connector manufacturer, has developed a new mil-spec electrical cabling connector with an integral electronics suite called the “Sentient Connector”, made with fiber composites. In a 2007 MDA SBIR MSI engineers developed and demonstrated a software application t ...
SBIR Phase I 2009 Department of DefenseMissile Defense Agency -
RadHard-Morphing-Sensing SuperSkins for Interceptor Kill Vehicles with Enhanced Lethality
SBC: NANOSONIC INC. Topic: MDA08003NanoSonic has recently developed nanostructured, large area (3’ x 10’) Shape Memory Metal Rubber™ (SM-MR™), a highly flexible, shielding, morphing ballistic defense missile super skin. NanoSonic would develop advanced synergistic morphing-sensing-shielding materials for interceptor kill vehicle structures and as key enablers for state-of-the-art adaptive UAV, missile and munitions airfram ...
SBIR Phase I 2009 Department of DefenseMissile Defense Agency -
Advanced LADAR Modeling
SBC: TAU TECHNOLOGIES LLC Topic: MDA08051The Airborne Laser (ABL) program has a need to evaluate the potential performance trade-offs for different Laser Ranger (or LADAR) systems, to measure the size, trajectory and plume characteristics of ballistic missiles at long ranges. The program office will need to independently examine, during the procurement evaluation process, the predicted performance of various proposed LADAR system config ...
SBIR Phase I 2009 Department of DefenseMissile Defense Agency