You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
Displaying 1 - 10 of 42 results
-
Unobtrusive Eyelid Closure & Visual Point of Regard Measurement Device
SBC: LC TECHNOLOGIES, INC. Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
Portable Electronic Device Detector
SBC: Megawave Corporation Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
Transit Fare Collection Decision Models for Fare Policy & Cost Analysis
SBC: Multisystems, Inc. Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
Development of Breakaway Guy Wires for Utility Poles
SBC: FOSTER-MILLER, INC. Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
Feasibility of Vehicle Borne Detection of Broken Rail
SBC: FOSTER-MILLER, INC. Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
A New Optical Traffic Monitor
SBC: Science Research Laboratory, Inc Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
Innovative Solutions to Improve Performance of Railroad Switch Frogs & Turnouts
SBC: Sharma & Associates, Inc. Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
Conceptual Design of a 'Tri-Coupler' System
SBC: Sharma & Associates, Inc. Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
High Resolution Data Sources and Applications for Transportation Planning
SBC: Shenandoah Mountain Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
A Proposal to Develop the UTD Breakaway Link for Use in Utility Pole Guy Wires
SBC: UTD, INC. Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation