You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Data Mining Techniques for Plan Sentinel Development

    SBC: DEUMBRA, INC.            Topic: N/A

    We propose a plan sentinel prototype consisting of three components. The first component is the development of a plan mining tool which identifies and computes false or missing assumptions and deviations to plans and time phased tasks. The second component, the annotated database, computes plans which the plan mining tool access and parses into a logical annotated rule set. Finally, MAVIS, a to ...

    SBIR Phase I 1997 Department of DefenseDefense Advanced Research Projects Agency
  2. SBIR Phase I: Tertiary Recycling Process for Polymer-Based Automotive Components

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 National Science Foundation
  3. SBIR Phase I: Liquid Crystalline Thermoset (LCT) Adhesives for High-Temperature Applications

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 National Science Foundation
  4. SBIR Phase I: Moisture-Resistant Composite Finishes

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 National Science Foundation
  5. Nanoelectric Modeling Software Development

    SBC: Advanced Device Technologies,            Topic: N/A

    This Phase I project has two primary objectives. The first objective is to develop an engineering model of Resonant Tunneling Devices (RTD) to be implemented in AIM-Spice, a commercial software package running under Windows 95/NT. The development of a reliable device model is a prerequisite for the design and production of any semiconductor device technology. The RTD model will be a semi-empiri ...

    SBIR Phase I 1997 Department of DefenseDefense Advanced Research Projects Agency
  6. SBIR Phase I: Automated Optimal Robot Trajectory Planner

    SBC: ANALYTICAL MECHANICS ASSOCIATES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1997 National Science Foundation
  7. SBIR Phase I: The Use of Doppler Radar for Estimating the Areal Extent of Strong Winds in Thunderstorms

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 National Science Foundation
  8. Automated Intrusion Detection for GCCS Les

    SBC: Arca Systems, Inc.            Topic: N/A

    Arca Systems proposes to initiate the design and development of an intrusion detection system for the GCCS LES (and similar environments). Many current intrusion detection tools are Unix-based, focused on a single host or on a generally homogeneous distributed environment. The notional GCCS LES environment makes extensive use of distributed architecture, using support from the COTS technologies ...

    SBIR Phase I 1997 Department of DefenseDefense Advanced Research Projects Agency
  9. Continuous Apertures

    SBC: ASTRON WIRELESS TECHNOLIGIES, INC.            Topic: N/A

    The program objective is to develop novel designs, techniques, and structures to synthesize apertures capable of efficient operation over broad frequency ranges and functions. Conventional apertures are narrowly focused, application specific, and basically single point design. To decrease the cost of antennas, a more universal building block design is required. It would provide a significantly ...

    SBIR Phase I 1997 Department of DefenseDefense Advanced Research Projects Agency
  10. SBIR Phase I: Versatile Economic Speech Technology (VEST)

    SBC: Automated Functions, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 National Science Foundation
US Flag An Official Website of the United States Government