You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Extending the Dynamic Flowgraph Methodology (DFM) to Model Human Performance and Team Effects

    SBC: ASCA, INC.            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  2. Integrated Risk Management and Quality Assurance

    SBC: Accident Prevention Group            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  3. EXPERIMENTAL EVALUATION OF FIBER OPTIC PRESSURE SENSORS FOR NUCLEAR POWER PLANTS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    AS A RESULT OF RECENT PROBLEMS SUCH AS THE OIL LOSS PHENOMENON IN SOME MODELS OF ROSEMOUNT PRESSURE TRANSMITTERS, THE NUCLEAR INDUSTRY HAS BECOME INTERESTED IN FIBER OPTIC PRESSURE TRANSMITTERS. THESE TRANSMITTERS ARE POTENTIAL CANDIDATES TO REPLACE THE EXISTING PRESSURE TRANSMITTERS IN THE SAFETY AND NON-SAFETY SYSTEMS OF NUCLEAR POWER PLANTS. FURTHERMORE, FIBER OPTIC PRESSURE TRANSMITTERS MAY BE ...

    SBIR Phase II 1995 Nuclear Regulatory Commission
  4. Extending the Dynamic Flowgraph Methodology (DFM) to Model Human Performance and Team Effects

    SBC: ASCA, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  5. DEVELOPMENT OF A METHODOLOGY FOR ANALYZING PRECURSORS TO EARTHQUAKE-INITIATED AND FIRE-INITIATED ACCIDENT SEQUENCES

    SBC: Future Resources Associate Inc            Topic: N/A

    ALTHOUGH THE ASP (ACCIDENT SEQUENCE PRECURSOR) METHODOLOGY FOR ANALYZING OPERATIONAL DATA AND EVENTS FOR PRECURSORS TO SEVERE ACCIDENTS HAS BEEN IN EXISTENCE FOR ABOUT A DECADE, IT DOES NOT NOW INCORPORATE THE ANALYSIS OF PRECURSORS TO EARTHQUAKE-INITIATED AND INTERNAL-FIRE-INITIATED ACCIDENT SEQUENCES. THIS PROJECT'S OBJECTIVE IS TO FILL THIS GAP BY DEVELOPING SUCH A METHODOLOGY. THE OBJECTIVE OF ...

    SBIR Phase II 1995 Nuclear Regulatory Commission
  6. Development of a Performance Assessment Process Controller

    SBC: Innovative Tech. Solutions            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  7. MEASUREMENT BASED DEPENDABILITY ANALYSIS FOR DIGITAL SYSTEMS

    SBC: SOHAR, INC.            Topic: N/A

    THE OBJECTIVE OF THIS PROJECT IS TO DEVELOP A MEASUREMENT-BASED METHODOLOGY AND A TOOL SET TO IMPLEMENT THE METHODOLOGY FOR PROBABILISTIC ANALYSIS OF OPERATIONAL DATA FROM NUCLEAR FACILITIES TO PROVIDE SYSTEMATIC AND OBJECTIVE EVALUATIONS OF RELIABILITY AND AVAILABILITY. THE RESULTS WILL BE A PARTICULAR USE FOR DEDICATION OF COMMERCIAL GRADE DIGITAL INSTRUMENTATION AND CONTROL (I&C) SYSTEMS IN NUC ...

    SBIR Phase II 1995 Nuclear Regulatory Commission
  8. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    WE PROPOSE TO EXPLOIT THE PROPERTIES OF OUR NEW, FAST, BRIGHT SCINTILLATOR, YAIO3:CE(+3) (YAP), TO CONSTRUCT A DETECTOR FOR PHOTONS WITH ENERGIES FROM 20 KEV TO 3 MEV. AN ARRAY OF THESE INDIVIDUAL DETECTORS WILL SERVE AS THE BASIS FOR A BROAD-BAND Y-RAY DOSIMETER CAPABLE OF MEASURING EXPOSURES FROM 5 MR/H TO 1 R/H AND EQUIVALENT DOSES FROM 5 X 10(-2) TO 10 (+4) MSV/H. THEA ADVANTAGES OF YAP SCINTI ...

    SBIR Phase II 1995 Nuclear Regulatory Commission
  9. DEVELOPMENT OF A DYNAMIC OPERATIONAL RISK MODEL TO SUPPORT RISK MANAGEMENT OF NUCLEAR POWER PLANTS

    SBC: Accident Prevention Group            Topic: N/A

    CURRENT ACTIVITY WITHIN THE NRC AND THE NUCLEAR INDUSTRY SEEKS TO EXPLOIT THE BENEFITS OF PRA IN RISK-BASED APPROACHES TO RELIEVE REGULATORY BURDEN ON THE ECONOMICALLY THREATENED NUCLEAR POWER PLANTS. THE ACCIDENT PREVENTION GROUP HAS BEEN DEVELOPING THE CONCEPT OF AN INTEGRATED RISK MANAGEMENT PROGRAM (IRMP) TOWARD SUCH GOALS. A KEY ELEMENT OF AN IRMP IS AN "OPERATIONAL RISK MODEL" OF THE NPP THA ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  10. NEW SENSOR FOR MEASUREMENT OF AIR MOVEMENT

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    THIS PROPOSAL IS PREPARED IN DIRECT RESPONSE TO THE NRC'S SOLICITATION FOR AN IMPROVED DEVICE TO MEASURE AIR MOVEMENT FOR PERSONNEL RADIATION PROTECTION AND HEALTH PHYSICS APPLICATIONS IN NUCLEAR FACILITIES. THE PURPOSE OF THE NEW DEVICE IS TO PROPERLY LOCATE AIR SAMPLERS SO THAT THE AIR SAMPLED IS REPRESENTATIVE OF THE AIR INHALED BY WORKERS. ALTHOUGH AIR FLOW RATE SENSORS SUCH AS ANEMOMETERS ARE ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government