You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Ultrafast Polysilylene Scintillators

    SBC: Adherent Technologies, Inc.            Topic: N/A

    40640 November 12, 1996 Adherent Technologies, Inc. Scintillators have been used for over 90 years to detect ionizing radiation, but solid organic scintillator, commonly used in physics experimentation, suffer from errors caused by pulse pileup. To minimize this problem, this project will examine a new class of polymeric materials which also offer the po ...

    SBIR Phase II 1997 Department of Energy
  2. High Power Target Design for a Next Generation Radioactive Beam ISOL-Type Facility

    SBC: Amparo Corp.on            Topic: N/A

    40063 November 4, 1996 Amparo Corporation First-generation radioactive beam facilities, in use or under construction, cannot completely address many of the scientific opportunities envisioned until an intense production beam is employed. This project addresses a key element in filling this need, the design of high power nuclear targets. The targe ...

    SBIR Phase II 1997 Department of Energy
  3. Ultra-Lightweight Carbon-Carbon Cooling Structure For Pixel and Silicon Strip Detectors

    SBC: HYTEC, INC.            Topic: N/A

    180 Ultra-Lightweight Carbon-Carbon Cooling Structure For Pixel and Silicon Strip Detectors-HYTEC, Inc., 110 Eastgate Dr., Suite 100, Los Alamos, NM 87544-3304; (505) 662-0080 Mr. William O. Miller, Principal Investigator Mr. William O. Miller, Business Official DOE Grant No. DE-FG03-97ER82397 Amount: $75,000 Removal of heat from the next generation of particle detection systems used in high ...

    SBIR Phase I 1997 Department of Energy
  4. Alternative Metal Forming Using Laser Engineered Net Shaping

    SBC: OPTOMEC, INC.            Topic: N/A

    50 Alternative Metal Forming Using Laser Engineered Net Shaping--Optomec Design Company, 13170 B Central Avenue SE, Suite 310, Albuquerque, NM 87123-3032; (505) 343-9139 Mr. David M. Keicher, Principal Investigator Mr. Thomas A. Swann, Business Official DOE Grant No. DE-FG03-97ER82448 Amount: $74,777 Energy intensive metal forming operations are among the most common steps in manufacturing ...

    SBIR Phase I 1997 Department of Energy
  5. A Novel Mass Spectrometer for Characterization of Electrochemical Processes

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    63 A Novel Mass Spectrometer for Characterization of Electrochemical Processes--Southwest Sciences, Inc., 1570 Pacheco Street, Suite E-11, Santa Fe, NM 87505-3937; (505) 984-1322 Dr. David S. Bomse, Principal Investigator Mr. Alan C. Stanton, Business Official DOE Grant No. DE-FG03-97ER82478 Amount: $75,000 Electrochemical processes are important to a wide variety of energy related systems suc ...

    SBIR Phase I 1997 Department of Energy
  6. Advanced Water Sensor for Unmanned Aerial Vehicles

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    40444 November 18, 1996 Southwest Sciences, Inc. Increasing energy consumption and environmental degradation may contribute to deleterious changes in the radiative balance and chemical composition of the atmosphere. The quantitative measurement of water vapor in the troposphere and lower stratosphere is crucial for the study of meteorological and climati ...

    SBIR Phase II 1997 Department of Energy
  7. Metal-Binding Silica Materials for Wastewater Cleanup

    SBC: TPL, INC            Topic: N/A

    41242 TPL, Inc. A number of industrial processes generate wastewater with heavy metal contamination. Existing cleanup processes have difficulties in achieving low metal contamination levels, especially in the presence of competing nontoxic ions, high ionic strengths, and particulate matter; costs of cleanup can be prohibitively high. An effective and economical process to remove heavy metal ions ...

    SBIR Phase II 1997 Department of Energy
  8. Analysis of Accelerator Tuning Algorithms for Integration with an Automatic Planning and Control System

    SBC: Vista Control Systems, Inc.            Topic: N/A

    145 Analysis of Accelerator Tuning Algorithms for Integration with an Automatic Planning and Control System--Vista Control Systems, Inc., 134-B Eastgate Drive, Los Alamos, NM 87544-3304; (505) 662-2484 Mr. Michael Kroupa, Principal Investigator Mr. Peter N. Klout, Business Official DOE Grant No. DE-FG03-97ER82506 Amount: $74,999 Particle accelerators have moved from being strictly a research ...

    SBIR Phase I 1997 Department of Energy
  9. Ultrafast Polysilylene Scintillators

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  10. High Power Target Design for a Next Generation Radioactive Beam ISOL-Type Facility

    SBC: Amparo Corp.on            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
US Flag An Official Website of the United States Government