You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Reflex Triode

    SBC: KTECH CORP.            Topic: N/A

    "Reflex triode bremsstrahlung sources potentially provide warm X-ray sources (20 keV to 500 keV), capable of generating high doses (~10 cal/g gold) over exposure areas of ~20 cm2. This needed capability allows experimental verification of warm X-ray inducedthermomechanical response, SGEMP, and box IEMP models for achieving component and system certification to hostile environments.In a reflex trio ...

    SBIR Phase II 2002 Department of DefenseDefense Threat Reduction Agency
  2. Prediction of Equivalent System Temperature: A Computer Methodology

    SBC: Applied Data Trends, Inc.            Topic: N/A

    There is a global trend towards utilization of satellite communications for information services. Equivalent system temperature, Ts, is a significant parameter in quantifying the antenna system/link performance, because it represents the noise power spectral density in antenna system figures-of-merit, such as receiver gain/system temperature (G/T), and end-to-end Signal to Noise Ratio (SNR). Unf ...

    SBIR Phase II 1996 Department of Commerce
  3. A Virtual Machining and Inspection System (VMIS)

    SBC: Icamp, Inc.            Topic: N/A

    The purpose of the VMIS is to allow manufacturers the luxury of testing and perfecting manufacturing plans long before a single machine tool is turned on and resources are committed. The VMIS will allow the user to select an available machine tool and an available inspection device, specify a proposed inspection plan and a dimensional analysis procedure, and then build and inspect hundreds (or ev ...

    SBIR Phase II 1996 Department of Commerce
  4. DEVELOPMENT OF A HARDNESS ASSURANCE THROUGHPUT OPTIMIZED TESTER

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    INTEGRATED CIRCUIT (IC) PRODUCTION LINES OPERATING UNDER MIL-I-38535 HAVE RADIATION HARNESS ASSURANCE (RHA) AND RELIABILITY DESIGNED AND BUILT INTO THEIR TECHNOLOGY. HARDNESS AND RELIABILITY ARE MAINTAINED BY APPLYING STATISTICAL PROCESS CONTROLS (SPCS) TO TEST STRUCTURES FABRICATED ALONGSIDE PRODUCT MICROCIRCUITS. MEASUREMENT AND DATA REDUCTION TECHNIQUES PRESENTLY EMPLOYED ARE SLOW AND COSTLY AN ...

    SBIR Phase II 1994 Department of DefenseDefense Threat Reduction Agency
US Flag An Official Website of the United States Government