You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
REAL-TIME COLLECTION OF OPERATIONAL DATA TO SUPPORT RISK-BASED OPERATION REGULATION AND INSPECTIONS AT NUCLEAR POWER PLANTS
SBC: Accident Prevention Group Topic: N/ACOMPUTERIZED DATA COLLECTION DEVICES EXIST AND ARE BEING USED IN VARIOUS APPLICATIONS AT SOME NPPS FOR SYSTEMS AND EQUIPMENT NOT INSTRUMENTED IN THE CONTROL ROOM. HOWEVER, CURRENT APPLICATIONS IN THE NUCLEAR POWER INDUSTRY ARE RATHER SPORADIC AND NOT EXPLOITING THE FULL POTENTIAL OF THE TECHNOLOGY. FOR EXAMPLE, SEVERAL DIFFERENT NPPS USE SUCH SYSTEMS FOR SINGLE- PURPOSES SUCH AS TRENDS IN EQUIPMEN ...
SBIR Phase I 1993 Nuclear Regulatory Commission -
ADVANCED METHODS FOR MODELING TEAM EFFECTS ON CONTROL-ROOM OPERATOR PERFORMANCE IN REAL-TIME
SBC: ASCA, INC. Topic: N/ATHIS RESEARCH SEEKS THE DEVELOPMENT AND DEMONSTRATION OF A MODEL THAT REPRESENTS THE GROUP DECISION-MAKING PROCESSES TAKING PLACE INSIDE THE CONTROL ROOM OF A NUCLEAR POWER PLANT UNDER BOTH NORMAL AND ABNORMAL OPERATING CONDITIONS. COGNITIVE DECISIONS, TEAM EFFECTS, AND DYNAMIC FEATURES ARE AMONG THE MAJOR ISSUES THAT WILL BE ADDRESSED IN THE PROJECT. THE BASIC TOOL TO BE USED IS THE INFLUENCE DIA ...
SBIR Phase I 1993 Nuclear Regulatory Commission -
COMPUTERIZED EMERGENCY OPERATION PROCEDURES RESEARCH
SBC: Accident Prevention Group Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
AN ADAPTING FINITE ELEMENT MODEL FOR UNSATURATED POROUS MEDIA
SBC: Advanced Projects Research, Incorporated Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
DEVELOPMENT OF TOOLS FOR SAFETY ANALYSIS OF CONTROL SOFTWARE IN ADVANCED REACTORS
SBC: Advanced Systems Concepts Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS
SBC: TPL, INC Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
SCOPING ANALYSIS OF LWR SHUTDOWN ACCIDENTS INITIATED BY EARTHQUAKES AND INTERNAL FIRES
SBC: Future Resources Associate Inc Topic: N/AN/A
SBIR Phase I 1990 Nuclear Regulatory Commission -
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT
SBC: MISSION RESEARCH CORP. Topic: N/AMRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
EVAL OF RELIABILITY & USEFULNESS OF EXTERNAL-INITIATOR PRA METHODOLOGIES
SBC: Future Resources Associate Inc Topic: N/ATHE DISCIPLINE OF EXTERNAL-INITIATOR PRA ANALYSIS IS RELA- TIVELY LESS MATURE AND LESS RELIABLE THAN THE CORRESPONDING INTERNAL-INITIATORS PRA ANALYSIS. THESE RELATIVE WEAKNESSESHAVE MADE MANY DECISION-MAKERS, IN BOTH INDUSTRY AND THE NRCRELUCTANT TO USE EXTERNAL-INITIATOR PRA RESULTS. THE EXTER-NAL-INITIATOR ANALYSES HAVE BEEN CONSIDERED TOO UNCERTAIN, OR TOO CONSERVATIVE, OR SUPPORTED BY TOO LIT ...
SBIR Phase I 1988 Nuclear Regulatory Commission -
VALIDATION & TESTING OF THE VAM2D COMPUTER CODE
SBC: Hydrogeologic Inc. Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission