You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Self-Monitoring Surveillance System for Prestressing Tendons

    SBC: Construction Technology            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  2. Development of a Performance Assessment Process Controller

    SBC: Innovative Tech. Solutions            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  3. TURBULENT NATURAL CONVECTION IN REACTOR CORE MELT

    SBC: INNOVATIVE RESEARCH, INC.            Topic: N/A

    PROGRESSION OF MOLTEN POOL, FORMED IN SEVERE ACCIDENT SCENARIOS, IS STRONGLY DEPENDENT ON ITS HEAT TRANSFER CHARACTERISTICS. THE PURPOSE OF THE PROPOSED RESEARCH IS TO PERFORM A COMPUTATIONAL ANALYSIS OF THE TURBULENT NATURAL CONVECTION IN INTERNALLY HEATED POOLS. TWO VERSIONS OF THE LOW-REYNOLDS-NUMBER MODELS WILL BE FIRST VALIDATED FOR THE PREDICTION OF TURBULENT NATURAL CONVECTION FLOWS OF INTE ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  4. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  5. VALIDATION & TESTING OF THE VAM2D COMPUTER CODE

    SBC: Hydrogeologic Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  6. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government