You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Engineering Models for Damage to Structural Components Subjected to Internal Blast Loading

    SBC: PROTECTION ENGINEERING CONSULTANTS LLC            Topic: DTRA08006

    Algorithms are needed for fast-running engineering models that predict damage levels of structural members subject to the blast environment from high explosives detonated inside a building (i.e., internal explosions). These algorithms will be used as part of vulnerability analyses that quickly assess building blast damage from internal explosion scenarios associated with terrorist threats, mission ...

    SBIR Phase II 2009 Department of DefenseDefense Threat Reduction Agency
  2. A NOVEL FIELD PROGRAMMABLE GATE ARRAY FOR SPACE APPLICATIONS

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    Mission Research Corporation proposes the development of a unique FPGA (field programmable gate array) for applications in space and other military and civilian environments requiring the versatility of reconfigurability with retention of the configuration in an unpowered state. The FPGA will be capable of being configured once and retaining that configuration for a minimum of 10 years even with ...

    SBIR Phase II 1997 Department of DefenseDefense Threat Reduction Agency
  3. An Improved Plasma Opening Switch for DECADE

    SBC: NumerEx            Topic: N/A

    CURRENT ATTEMPTS TO USE THE PLASMA OPENING SWITCH (POS) FOR DECADE HAVE NOT YET BEEN ENTIRELY SUCCESSFUL DUE TO THE APPARENT INABILITY OF THE SWITCH TO OPEN EFFICIENTLY TO A HIGH-IMPEDENCE LOAD. RESEARCH DIRECTED TOWARD IMPROVING THE PERFORMANCE OF THE POS IN THE LONG-CONDUCTION TIME REGIME HAS BEEN FRUSTRATED BY THE INABILITY OF COMPUTATIONAL TOOLS TO OPERATE IN THE PARAMETER REGIMES OF INTEREST ...

    SBIR Phase II 1997 Department of DefenseDefense Threat Reduction Agency
US Flag An Official Website of the United States Government