You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
SCOPING ANALYSIS OF LWR SHUTDOWN ACCIDENTS INITIATED BY EARTHQUAKES AND INTERNAL FIRES
SBC: Future Resources Associate Inc Topic: N/AN/A
SBIR Phase I 1990 Nuclear Regulatory Commission -
EVAL OF RELIABILITY & USEFULNESS OF EXTERNAL-INITIATOR PRA METHODOLOGIES
SBC: Future Resources Associate Inc Topic: N/ATHE DISCIPLINE OF EXTERNAL-INITIATOR PRA ANALYSIS IS RELA- TIVELY LESS MATURE AND LESS RELIABLE THAN THE CORRESPONDING INTERNAL-INITIATORS PRA ANALYSIS. THESE RELATIVE WEAKNESSESHAVE MADE MANY DECISION-MAKERS, IN BOTH INDUSTRY AND THE NRCRELUCTANT TO USE EXTERNAL-INITIATOR PRA RESULTS. THE EXTER-NAL-INITIATOR ANALYSES HAVE BEEN CONSIDERED TOO UNCERTAIN, OR TOO CONSERVATIVE, OR SUPPORTED BY TOO LIT ...
SBIR Phase I 1988 Nuclear Regulatory Commission -
VALIDATION & TESTING OF THE VAM2D COMPUTER CODE
SBC: Hydrogeologic Inc. Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
IMPROVED MODEL FOR PREDICTING J-R CURVES FROM CHARPY DATA
SBC: Modeling & Computing Services Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
FACILITATE DEVELOPMENT AND EVALUATION OF FAULT TREES
SBC: Expert-ease Systems Topic: N/AWORKSTATION AND EXPERT SYSTEM TECHNOLOGIES HAVE A POTENTIAL OF SUBSTANTIALLY FACILITATING THE DEVELOPMENT AND EVALUATIONOF FAULT TREES. INTRODUCING A WORKSTATION PHILOSOPHY WITH AN INTERACTIVE SET OF INTEGRATED SOFTWARE TOOLS ON A LOCAL COMPUTER WILL PROMOTE IMPROVED CONTINUITY IN THE THOUGHT PROCESS DURING A FAULT TREE DEVELOPMENT. THE EXPERT SYSTEM TECHNOLOGY WILL SIMPLIFY THE WAY FAULT TREES AR ...
SBIR Phase I 1985 Nuclear Regulatory Commission -
WITHIN A LABORATORY ENVIRONMENT, EMATS HAVE BEEN USED TO CHARACTERIZE DEFECTS IN BOTH FERRITIC AND AUSTENITIC WELDS.
SBC: Materials Engineering & Topic: N/AWITHIN A LABORATORY ENVIRONMENT, EMATS HAVE BEEN USED TO CHARACTERIZE DEFECTS IN BOTH FERRITIC AND AUSTENITIC WELDS . THE USE OF SHEAR-HORIZONTAL (SH) WAVES HAS PROVEN PART DEFECTS. FOR FRACTURE MECHANICS EVALUATION OF WELDED STRU STRUCTURES, IT IS PARTICULARLY IMPORTANT TO KNOW THE THROUGHEXTENT OF PLANAR DEFECTS. THIS PROPOSAL SEEKS SUPPORT FOR THE EVALUATION OF A NEW APPROACH TO WELD DEFECT CHA ...
SBIR Phase I 1985 Nuclear Regulatory Commission -
IN-REACTOR MEASUREMENTS INVOLVING ELECTROCHEMICAL POTENTIAL A NUMBER OF BOILING WATER REACTORS (BWRS) SUGGEST THAT THE WATER CHEMISTRY OF THE PRIMARY COOLANT OF EACH BWR MAY BE UNIQUE WITH RESPECT TO ITS ABILITY TO FACILITATE IGSCC AND/ OR MAY CHANGE
SBC: Michael Fox Topic: N/AIN-REACTOR MEASUREMENTS INVOLVING ELECTROCHEMICAL POTENTIAL A NUMBER OF BOILING WATER REACTORS (BWRS) SUGGEST THAT THE WATER CHEMISTRY OF THE PRIMARY COOLANT OF EACH BWR MAY BE UNIQUE WITH RESPECT TO ITS ABILITY TO FACILITATE IGSCC AND/ OR MAY CHANGE WITH REACTOR OPERATING TIME OR AGE. THE WORK PROPOSED IS TO GATHER, REVIEW, ORGANIZE, COMPILE, C COMPUTERIZE, AND ANALYZE IN-REACTOR DATA PERTAINING ...
SBIR Phase I 1985 Nuclear Regulatory Commission -
METHODS TO UNDERSTAND AND ANALYZE AGING EFFECTS
SBC: Sea Consultants Topic: N/AN/A
SBIR Phase I 1985 Nuclear Regulatory Commission -
PROBABILITY OF FLOODS WITH VERY LONG RETURN PERIODS
SBC: Linsley Kraeger Associates Ltd Topic: N/AN/A
SBIR Phase I 1984 Nuclear Regulatory Commission