You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Extending the Dynamic Flowgraph Methodology (DFM) to Model Human Performance and Team Effects
SBC: ASCA, INC. Topic: N/AN/A
SBIR Phase II 1996 Nuclear Regulatory Commission -
Development of Self-Repairing Concrete Containers of Radioactive Waste Using Superelastic Reinforcement
SBC: DPD, Inc. Topic: N/AN/A
SBIR Phase II 1996 Nuclear Regulatory Commission -
Inservice Diagnostics of Motor Operated Valves
SBC: ACENTECH INCORPORATED Topic: N/AN/A
SBIR Phase II 1996 Nuclear Regulatory Commission -
A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material
SBC: Shonka Research Associates Topic: N/AN/A
SBIR Phase II 1996 Nuclear Regulatory Commission -
Integrated Risk Management and Quality Assurance
SBC: Accident Prevention Group Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
EXPERIMENTAL EVALUATION OF FIBER OPTIC PRESSURE SENSORS FOR NUCLEAR POWER PLANTS
SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION Topic: N/AAS A RESULT OF RECENT PROBLEMS SUCH AS THE OIL LOSS PHENOMENON IN SOME MODELS OF ROSEMOUNT PRESSURE TRANSMITTERS, THE NUCLEAR INDUSTRY HAS BECOME INTERESTED IN FIBER OPTIC PRESSURE TRANSMITTERS. THESE TRANSMITTERS ARE POTENTIAL CANDIDATES TO REPLACE THE EXISTING PRESSURE TRANSMITTERS IN THE SAFETY AND NON-SAFETY SYSTEMS OF NUCLEAR POWER PLANTS. FURTHERMORE, FIBER OPTIC PRESSURE TRANSMITTERS MAY BE ...
SBIR Phase II 1995 Nuclear Regulatory Commission -
Extending the Dynamic Flowgraph Methodology (DFM) to Model Human Performance and Team Effects
SBC: ASCA, INC. Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
Self-Monitoring Surveillance System for Prestressing Tendons
SBC: Construction Technology Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
Development of Self-Repairing Concrete Containers of Radioactive Waste Using Superelastic Reinforcement
SBC: DPD, Inc. Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
DEVELOPMENT OF A METHODOLOGY FOR ANALYZING PRECURSORS TO EARTHQUAKE-INITIATED AND FIRE-INITIATED ACCIDENT SEQUENCES
SBC: Future Resources Associate Inc Topic: N/AALTHOUGH THE ASP (ACCIDENT SEQUENCE PRECURSOR) METHODOLOGY FOR ANALYZING OPERATIONAL DATA AND EVENTS FOR PRECURSORS TO SEVERE ACCIDENTS HAS BEEN IN EXISTENCE FOR ABOUT A DECADE, IT DOES NOT NOW INCORPORATE THE ANALYSIS OF PRECURSORS TO EARTHQUAKE-INITIATED AND INTERNAL-FIRE-INITIATED ACCIDENT SEQUENCES. THIS PROJECT'S OBJECTIVE IS TO FILL THIS GAP BY DEVELOPING SUCH A METHODOLOGY. THE OBJECTIVE OF ...
SBIR Phase II 1995 Nuclear Regulatory Commission