You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Adaptation of Dynepic's DX Platform for XR Digital Asset Certification, Tracking, and Remix Capability in the USAF
SBC: DYNEPIC, INC. Topic: X224OCSO1Vendors (large and small) are being contracted to develop novel training applications leveraging the latest technologies. Because of the current siloed nature of acquisitions and program management many departments across the USAF are paying for models and training applications that have already been developed by other departments. Compounding this issue, there are serious limitations with confirm ...
SBIR Phase I 2023 Department of DefenseAir Force -
Attritable Airborne Precision Delivery System
SBC: BLUE AETHER INC Topic: AFX235CSO1The airborne precision delivery mission will need to be conducted from higher altitudes and higher speeds when faced against a near peer threat in both urban and rural operational environments. With the greater standoff distance, operators will require t
SBIR Phase I 2023 Department of DefenseAir Force -
Adaptation of Dynepic’s MOTAR Platform to Enable Robust Human Performance Analyses of Sensor Data
SBC: DYNEPIC, INC. Topic: AFX235CSO1The DoD is deeply investing in the development of more sophisticated sensor technologies and human performance analysis tools. Unfortunately, most of the relevant sensor data and associated toolsets (e.g., applications, AI engines, classifiers, etc.) are
SBIR Phase I 2023 Department of DefenseAir Force -
Vertical Take Off and Land Family of Systems (VTOL FoS)
SBC: VALKYRIE SYSTEMS AEROSPACE, INC Topic: AFX235CSO1With a reduced cost to acquisition and a low operating cost per hour, these unmanned systems are perfect for the needs of the DAF and commercial customers. Additionally, the XVH-100 has proven its technical merits Through foundational technology in prior
SBIR Phase I 2023 Department of DefenseAir Force -
BAM for Rocket Engine Additive Manufacturing
SBC: MOUNTAIN AEROSPACE RESEARCH SOLUTIONS, INC. Topic: AFX235CSO1America's adversaries are making significant scientific advancements in hypersonic propulsion technology, leaving the U.S. Air and Space Forces vulnerable. All aerospace capabilities ultimately depend on propulsion. Mountain Aerospace Research Solutions
SBIR Phase I 2023 Department of DefenseAir Force -
A Low-Cost, Modular Blast Acquisition Test System
SBC: ADVANCED MATERIALS & DEVICES Topic: DHA22B001This Small Business Technology Transfer Phase II effort aims to develop a fully integrated, modular human surrogate, a software suite, and wireless data transmission. The main goals of the Phase II project will be to increase the biofidelity, modularity, and manufacturability of the low-cost, sensor-integrated surrogate developed in Phase I. In Phase II, the prototype that was developed in Pha ...
STTR Phase II 2023 Department of DefenseDefense Health Agency -
Project Fins
SBC: DARE VENTURE GROUP LLC Topic: N222114To address the DON’s need for developing methods to produce accurate riblet profiles in outer mold line (OML) surfaces that yield significant drag savings, fuel cost savings and extended range for USN aircraft, DARE Venture Group is partnered with MicroTau to deliver that exact development related to specific US Naval aircraft requirements. This project includes objectives encompassing the resea ...
SBIR Phase I 2023 Department of DefenseNavy -
BeaverFit
SBC: BEAVERFIT NORTH AMERICA LLC Topic: A234005Proposed Approach: BeaverFit seeks to satisfy the requirements of this proposal and subsequent SBIR phases through four main technical objectives (TO). Metrics of success will be applied to each TO to validate the effectiveness of the project and track progress toward accomplishment of the desired end state. Key measures of performance identified within the TO include cost, timelines, and throughp ...
SBIR Phase I 2023 Department of DefenseArmy -
Affordable Rapid Manufacturing of Fused Carbon Fiber Reinforced Ultra High Temperature Composites
SBC: SIC TECHNOLOGIES, INC. Topic: AF224D025Carbon SiC Technologies, Inc. can provide and integrate the next generation TPS material for hypersonic scramjet components using several years of experience in development of Fused Carbon Fiber Reinforced Silicon Carbide - Zirconium Diboride (CF-SiC- ZrB
SBIR Phase II 2023 Department of DefenseAir Force -
Adaptation of Dynepic's DX Platform for Digital Asset Certification, Tracking, And Remix Capability in the USAF
SBC: DYNEPIC, INC. Topic: X224OCSO1Vendors (large and small) are being contracted to develop novel training applications leveraging the latest technologies. Because of the current siloed nature of acquisitions and program management many departments across the USAF are paying for models an
SBIR Phase II 2023 Department of DefenseAir Force