You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
04b Quick-Turn Spaceborne Printed Circuit Boards
SBC: MICRO-PRECISION TECHNOLOGIES, INC. Topic: C5404bThere is no manufacturing solution available today that can achieve quick-turn production of spaceborne printed circuit boards while adhering to the rigidity requirements of industry standards and surviving the rigors of space launch and flight. To fulfill the production needs of the defense and aerospace industries, this program will develop an additive manufacturing process combining the ruggedn ...
SBIR Phase II 2023 Department of Energy -
Automated Vestibular Rehabilitation Management System
SBC: CREARE LLC Topic: DHA182005Dizziness is a common complaint, with about one third of the population experiencing dizziness at some point in their life. Vestibular rehabilitation targets vestibular adaptation and substitution for patients with vertigo and dizziness of vestibular origin. Unfortunately, vestibular rehabilitation requires specialized physical therapists who may not be accessible to service members or the general ...
SBIR Phase II 2023 Department of DefenseDefense Health Agency -
Control of Grain Properties and Slug Geometry for High-Performance Metallic Fuel
SBC: CREARE LLC Topic: C5640vC56-40v-272647Next-generation nuclear power plants can provide a large-scale source of environmentally benign power generation while improving safety and minimizing proliferation risks. For best performance, these reactors will require large numbers of uranium alloy fuel slugs produced with metallurgical properties that enable reliable, long-term operation. No method currently exists for high-volu ...
SBIR Phase I 2023 Department of Energy -
Crack Prevention and Mitigation for New and In-Service Dry Storage Canisters
SBC: CREARE LLC Topic: C5641bC56-41b-273026Welded stainless steel canisters at near-marine sites that contain spent nuclear fuel (SNF) have been found with salts on their outer surface that can produce an aggressive chemical environment. These conditions could lead to pitting, stress corrosion cracking (SCC), and potential release of radioactive materials. We propose to develop an innovative process and device for mitigating ...
SBIR Phase I 2023 Department of Energy -
Low Cost Blast Test Surrogate
SBC: CREARE LLC Topic: DHA22B001Blast-induced Traumatic Brain Injury (TBI) is a major threat to the health of military personnel serving in modern theaters. TBI incidence rates in Operation Enduring Freedom and Operation Iraqi Freedom approached 3% of all deployed personnel. Indeed, TBI has become known as the “signature” injury of these conflicts. Blast overpressure can also damage the lungs, eardrums, and eyes. Development ...
STTR Phase II 2023 Department of DefenseDefense Health Agency -
Multi-User, Reliable Hearing Protection Fit Test System with Integrated Education
SBC: Edare LLC Topic: DHA221002Hearing is important to our physical and mental health. Within the Department of Defense (DOD), more than 200,000 service members have hearing impairment and close to 500,000 Veterans receive compensation for service-connected hearing loss. To protect personnel from hearing loss, DOD Instruction 6055.12 establishes requirements for Hearing Conservation Programs (HCPs). Under 6055.12, each DOD Comp ...
SBIR Phase II 2023 Department of DefenseDefense Health Agency -
Non-contact, low-cost, stage and velocity sensors for monitoring urban streamflow
SBC: SUBSURFACE INSIGHTS LLC Topic: C5516bHalf of the world’s population lives in urban watersheds. In order to predict how these watersheds will behave under current and future weather dynamics (e.g. if , how and where flooding would occur due to intense rainfall), we need dense measurements of river stage and river velocity. Current instruments are too expensive to deploy in the quantities needed to provide these dense measurements. A ...
SBIR Phase I 2023 Department of Energy -
Non-contact, low-cost, stage and velocity sensors for monitoring urban streamflow
SBC: SUBSURFACE INSIGHTS LLC Topic: C5516bHalf of the world’s population lives in urban watersheds. In order to predict how these watersheds will behave under current and future weather dynamics (e.g. if , how and where flooding would occur due to intense rainfall), we need dense measurements of river stage and river velocity. Current instruments are too expensive to deploy in the quantities needed to provide these dense measurements. A ...
STTR Phase I 2023 Department of Energy -
Low Cost Blast Test Surrogate
SBC: CREARE LLC Topic: DHA22B001Blast-induced Traumatic Brain Injury (TBI) is a major threat to the health of military personnel serving in modern theaters. TBI incidence rates in Operation Enduring Freedom and Operation Iraqi Freedom approached 3% of all deployed personnel. TBI has become known as the “signature” injury of these conflicts. Blast overpressure can also damage the lungs and rupture the eardrums. Development an ...
STTR Phase I 2022 Department of DefenseDefense Health Agency -
Next Generation Power Converters for Distributed Wind Applications
SBC: INTERGRID, LLC. Topic: C5219bStatement of the Problem There are presently no UL1741 certified, commercially available inverters or turbine ac-dc converters available for the US distributed wind market. “Distributed Wind” is defined as 10 kW to 1 MW in turbine rated power. Intergrid has been working to solve this problem for small wind turbines up to 25 kW rated power. Also new work under NREL Component Improvement contrac ...
SBIR Phase II 2022 Department of Energy