You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A HIGH PERFORMANCE HEAT EXCHANGER FOR HIGH HEAT FLUX COMPO- NENTS OF FUSION REACTORS

    SBC: CREARE LLC            Topic: N/A

    ACTIVE COOLING IS ESSENTIAL FOR FUSION REACTOR COMPONENTS EXPOSED TO HIGH HEAT FLUX LEVELS OVER LONG PULSE DURATIONS. EXISTING WATER COOLING CONCEPTS FACE A POTENTIAL PROBLEM WITH TRITIUM PERMEATION. HELIUM GAS COOLING CONCEPTS NOW BEING CONSIDERED SUFFER FROM LOW HEAT TRANSFER COEFFICIENTS AND HIGH PRESSURE DROP AND PUMPING POWER. THESE EXISTING TECHNIQUES, THOUGH ACCEPTABLE FOR PRESENT FUSION DE ...

    SBIR Phase II 1989 Department of Energy
  2. AN ULTRASONIC DEVICE FOR DIRECT MEASUREMENT OF LARGE AMPLI- TUDE MOTIONS IN SEISMIC TESTING

    SBC: CREARE LLC            Topic: N/A

    SEISMIC TESTS PROVIDE IMPORTANT DATA FOR IMPROVING THE SAFETY OF PIPING DESIGNS AND THE COST-EFFECTIVENESS OF DESIGN STANDARDS. UNFORTUNATELY, DISPLACEMENT MEASUREMENTS AT LOW FREQUENCIES FROM SUCH TESTS ARE GENERALLY UNAVAILABLE, EITHER BECAUSE DOUBLE INTEGRATION OF ACCELEROMETER SIGNALS CAUSES INACCURACIES OR BECAUSE LASER BASED EQUIPMENT IS TOO COSTLY TO ALLOW FOR SIMULTANEOUS MEASUREMENTS IN S ...

    SBIR Phase II 1989 Department of Energy
US Flag An Official Website of the United States Government