You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Hardware Assisted Electronic Circuit Simulation System

    SBC: EM PHOTONICS INC            Topic: SB041029

    In Phase I, EM Photonics demonstrated the viability of using a reconfigurable hardware approach to accelerating the simulation of electronic circuits based on their electromagnetic properties. In Phase II, this technology will be used to create a solver capable of analyzing mixed signal circuits 64 times faster than is currently available from equivalent software. The resulting device will shrin ...

    SBIR Phase II 2005 Department of DefenseDefense Advanced Research Projects Agency
  2. Chemical Nano-Imprint Lithography

    SBC: EM PHOTONICS INC            Topic: SB041030

    The overall objective of this Phase II project is to optimize the fabrication procedure associated with the chemical lithography proposed in Phase I to fabricate nanophotonic structures and devices at a fraction of the cost of existing technologies. We plan to use our optimized chemical lithography procedure to fabricate an ultra-high resolution patterns and devices including nano-probe for near f ...

    SBIR Phase II 2005 Department of DefenseDefense Advanced Research Projects Agency
  3. SOCOM SOF Combatant Motion Recording and Biofeedback System

    SBC: MEMSense, LLC            Topic: SOCOM02007

    The United States Special Operations Command’s Special Boat Teams are routinely exposed to an environment prone to injury and the long-term effects of repetitive impact stress. The primary cause for injury and long-term degenerative musculoskeletal effects is the repetitive impacts incurred as the MK V and NSW RIB vessels impact the ocean’s surface. The goal of SOCOM02-007 Phase II research is ...

    SBIR Phase II 2005 Department of DefenseSpecial Operations Command
  4. Demonstration of an Embedded Capability-Based Operating System

    SBC: STRAWBERRY DEVELOPMENT GROUP            Topic: SB052011

    We propose to study the feasibility of demonstrating a capability-based operating system running a home control application on an embedded processing platform. Capability-based systems have documented advantages in security and reliability, but no commercial system is available for an embedded processor. Some embedded processors raise issues such as cache coherency that present challenges for a ca ...

    SBIR Phase I 2005 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government