You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. On-board, Prognostic Micro-Structural Reliability Tool for Mechanical Systems

    SBC: VEXTEC Corporation            Topic: N/A

    Technology for extending the life of fielded systems offers the potential for signification saving in total ownershipcosts. On-board monitoring and analysis offers the potential to instill increased confidence in prediction of fatigue or remaining usefullife on an individual system basis. This, in turn, offers the potential to reduce premature part retirement. The Phase I project demonstrated t ...

    SBIR Phase II 2002 Department of DefenseDefense Advanced Research Projects Agency
  2. Crack Nucleation Prediction through Surface Roughness Measurement

    SBC: VEXTEC Corporation            Topic: SB072003

    Our commercial and military fleets operate safely but at a great cost. Downtime for structural inspections, elaborate sustainment equipment, long maintainer hours, expensive in-depot repair, continuous spectrum monitoring, and extensive component testing have effectively reduced the rates of structure-related accidents, but the costs are overwhelming. DARPA has proposed changing the paradigm of ai ...

    SBIR Phase I 2008 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government