You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. An Automated Modeling and Simulation Tool for Lightening the Load of Warfighters

    SBC: VizTek, Inc            Topic: N08T019

    Today’s Warfighter often carries an inordinate load that can lead to injuries and encumbered performance. Equipment is distributed among squad members with little, if any regard for differences in strength and anthropometry. Consequently, the current focus on human-centric design requires a modeling and simulation tool that can reduce the load Warfighters carry and can help distribute equipment ...

    STTR Phase II 2009 Department of DefenseNavy
  2. Passive Coherent Laser Amplifier Combining

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N07210

    Accurate Automation Corporation (AAC) will have two existing NAVSEA 1 kW fiber laser amplifiers modified to correct a previously identified problem of four-wave mixing. After testing to verify performance of the refurbished laser amplifiers, AAC will conduct tests with this equipment using a passive coherent combining technique patented by Northrop Grumman Corporation. The testing will indicate th ...

    SBIR Phase II 2009 Department of DefenseNavy
  3. Application of Neural Networks for Pattern Recognition in Logistics Data

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    In this Phase I SBIR, Accurate Automation Corporation will prototype key component technologies for a neural network-based Logistic Support Assistant that will assist Navy Supply Management personnel in planning and forecasting of logistics efforts. Fully developed as part of a Phase II effort, this system will help ensure smooth continuity of performance even when personnel are reassigned. ...

    SBIR Phase I 1996 Department of DefenseNavy
  4. Accurate Automation Corporation Fuzzy Logic/ Neural Network Processor

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    In this project we will adapt our programmable neural network processor (NNP) into a Fuzzy/neural network processor (FNNP). Already having the commercially successful NNP, we begin this program with more than half the work completed. we will define and evaluate NNP architectural modifications to optimize both data flow and data processing for both fuzzy logic and neural network- Operations- we w ...

    SBIR Phase I 1996 Department of DefenseNavy
  5. Carbon Nanotube Plasma Limiter

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: MDA06034

    The enabling solid state semiconductor technology in modern electronics and radar systems increases their vulnerability to the effects of high power, fast rise-time EMP, HPM, and UWB pulses. In recent years, significant advances in the technology used to produce these pulses have been made in the United States and abroad, increasing the need for effective protection against these threats. Howeve ...

    SBIR Phase II 2009 Department of DefenseDefense Advanced Research Projects Agency
  6. Portable Non-Contact Heating and Soldering Tool

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N091007

    Currently available soldering and heat gun systems have several significant deficiencies that can result in lower quality repairs and higher maintenance costs. The existing soldering irons naturally lead to cross-contamination between leaded and lead-free solders, resulting in degraded solder joints. The existing heat guns require bulky accessories and/or external electric power, making them unwie ...

    SBIR Phase I 2009 Department of DefenseNavy
  7. Development or Adaptation of Assistive Devices, Mechanisms, Technologies, or Techniques for Individuals with Disabilities

    SBC: Adaptive Computer Systems,            Topic: N/A

    Advancements in digital signal processing (DSP) and video technology have created an opportunity to develop a low-cost system to allow people with disabilities to control a computer using head and eye movements. A software-based system would be developed to track head and eye movements at much lower cost than the hardware-based systems currently available. The processing power available on the c ...

    SBIR Phase I 1996 Department of Education
  8. COMPUTER CONTROLLED MICROINDENTER SYSTEM

    SBC: Advanced Technologies/Laboratories Intl            Topic: N/A

    Incorporation of cleavage microcracks on otherwise crack free material is a new approach used in the fabrication of some microelectonics devices. This proposal describes the development of a new computer controlled microindenter system for the farication of microcracks on a crystalline substrate. System capabilities will include the introduction of two simultaneous Vickers indentations at precise ...

    SBIR Phase II 1996 Department of DefenseNavy
  9. Tailoring Training for Disparately Skilled Participants in Large Scale Training Exercises

    SBC: ADVANCED INFONEERING, INC.            Topic: N09T007

    Large scale training exercises involve many trainees at various stages of their training maturity and at various levels of skill. Problems arise in large scale exercises when less mature or lower skilled trainees are exposed to training scenarios that are too advanced or too complex for their level of training maturity. These trainees are more likely to fail the mission they are given in the train ...

    STTR Phase I 2009 Department of DefenseNavy
  10. Physiological-based Tools for Virtual Environment Fidelity Design Guidance

    SBC: ADVANCED INFONEERING, INC.            Topic: N07T028

    This proposal describes the proposed implementation of the concept of the Quality of Training Effectiveness Assessment (QTEA) system. This concept was developed in Phase I (N074-028-0065). Currently, VE design is guided by subjective design models that involve multiple design iterations and focus on trial and error. Our approach is innovative and new because it quantifies VE fidelity requirements ...

    STTR Phase II 2009 Department of DefenseNavy
US Flag An Official Website of the United States Government