You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Open Source Information Geospatial Overlay (OSIGO)

    SBC: Geosemble Technologies            Topic: ST071005

    The objective of this project is to develop a capability to automatically link news articles to satellite imagery and then to display summaries of the linked articles. In Phase I of this effort, we developed an initial approach to automatically link news articles to geographic locations and then cluster and summarize the linked articles. In our experimental evaluation, we showed that articles cou ...

    STTR Phase II 2009 Department of DefenseDefense Advanced Research Projects Agency
  2. Ultra-Fast 3 Terminal VCSEL (U-VCSEL)

    SBC: ZIVA CORPORATION            Topic: ST071008

    In this Phase II STTR proposal, Ziva in collaboration with subcontractor University California, Santa Barbara (UCSB) proposes to fabricate and demonstrate high speed, direct modulated U-VCSELs with the goal to achieve high frequency (f3dB > 80 GHz) modulation capability with moderate (< 0.5 mW) optical output power. Modeling and simulation of the devices will provide in-depth understanding of devi ...

    STTR Phase II 2009 Department of DefenseDefense Advanced Research Projects Agency
  3. Modification of Wireless Fidelity Communication Devices to Support the Urban Warrior

    SBC: TM Tech            Topic: ST061008

    The objective of this Phase II proposal is to implement a single-chip SiGe BiCMOS ASIC and integrate it into an ultra-compact, portable, RF sensing device in a dongle form-factor to support squad leader and foot soldiers in an urban warfare environment. The RF front-end chip leverages research in high-performance radio frequency and analog circuit design at USC. Component and system integration ...

    STTR Phase II 2009 Department of DefenseDefense Advanced Research Projects Agency
  4. High Voltage, High Power Diamond Solid-State Switch for Pulsed Power and Other Applications

    SBC: ALAMEDA APPLIED SCIENCES CORPORATION            Topic: N/A

    Alameda Applied Sciences Corporation (AASC) proposes a three phase effort with the ultimate goal of producing a marketable diamond switch suitable for several pulsed power and other applications in the defence arena. The presently used spark gaps have several drawbacks including switch jitter, large and variable inductance, lifetime and physical size. A low inductance solid-state switch capable ...

    SBIR Phase I 1996 Department of DefenseDefense Advanced Research Projects Agency
  5. Feasibility of Using Impulse Radar to Detect and Identify Concealed Weapons

    SBC: AKELA INC            Topic: N/A

    This proposal seeks to demonstrate the feasibility of using impulse radar techniques to detect and identify concealed weapons. It relies on the fact that a radar impulse will excite natural electromagnetic resonances which characterize the size, shape and material composition of an object. These resonances are present in the scattered transient return from the object and can be extracted by algo ...

    SBIR Phase I 1996 Department of DefenseDefense Advanced Research Projects Agency
  6. Carbon Nanotube Plasma Limiter

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: MDA06034

    The enabling solid state semiconductor technology in modern electronics and radar systems increases their vulnerability to the effects of high power, fast rise-time EMP, HPM, and UWB pulses. In recent years, significant advances in the technology used to produce these pulses have been made in the United States and abroad, increasing the need for effective protection against these threats. Howeve ...

    SBIR Phase II 2009 Department of DefenseDefense Advanced Research Projects Agency
  7. Maximizing Sleep Quality and Efficiency using Neurotechnology

    SBC: ADVANCED BRAIN MONITORING, INC.            Topic: SB072006

    Military operations require sustained cognitive performance in challenging environments. Situational awareness, vigilance, memory, decision-making, and other neurocognitive processes are all impacted by poor sleep quality, sleep deprivation and accumulating sleep debt with potentially detrimental consequences. Although efficient amelioration of the effects of sleep deprivation or accumulated sleep ...

    SBIR Phase II 2009 Department of DefenseDefense Advanced Research Projects Agency
  8. Streamlined Neurotechnology for Operational Applications

    SBC: ADVANCED BRAIN MONITORING, INC.            Topic: SB082007

    Advanced Brain Monitoring (ABM) developed patented low cost, easy-to-use, portable systems to monitor and interpret physiological signals, including the brain''s electrical activity (EEG) and cardiac activity. These technologies can be applied in real-time or off-line and have proven useful in quantifying the changes in alertness, learning and memory associated with sleep deprivation in healthy s ...

    SBIR Phase I 2009 Department of DefenseDefense Advanced Research Projects Agency
  9. Novel Neurotherapy for Post-Traumatic Stress Disorder

    SBC: ADVANCED BRAIN MONITORING, INC.            Topic: SB082007

    The recent military buildup in Iraq and Afghanistan with its associated stressors of warfare have resulted in a significant increase in new cases of posttraumatic stress disorder (PTSD). Sleep disturbances comprise prominent features of PTSD and have been suggested to have a pathogenic role in the disease. PTSD is characterized by disinhibition of rapid-eye-movement (REM) sleep including decreas ...

    SBIR Phase I 2009 Department of DefenseDefense Advanced Research Projects Agency
  10. Micro Unmanned Aerial Vehicle (UAV) System Design and Operation

    SBC: AEROVIRONMENT, INC.            Topic: N/A

    Aerovironmet Inc. proposes to undertake Phase I of DDARPA SBIR 962-080 to develop and assess operational utility of micro air vehicles (micro AV) for unique military applications. We will downselect from nine general categories of airframes, four general categories of propulsion systems to a minimum of five conceptual designs. These design concepts will be evaluated against notional mission sce ...

    SBIR Phase I 1996 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government