You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ASSESSMENT OF FIBER REINFORCED PLASTICS FOR COMBATANT SUBMARINE STRUCTURES

    SBC: Abaris            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseNavy
  2. APPLICATIONS TO TRANSITION FROM SCHOOL TO WORK

    SBC: Abt Associates Inc.            Topic: N/A

    THIS THREE PHASE PROJECT IS DESIGNED TO ASSIST DISABLED STUDENTS IN TRANSITION FROM SCHOOL TO WORK BY PROVIDING TWO NEW MICROCOMPUTER-BASED PROGRAMS TO REHILITATION SPECIALISTSIN THE WISCONSIN DIVISION OF VOCATIONAL REHABILITATION SPECIAL SERVICES UNIT WHICH ANNUALLY EVALUATES AND SCREENS OVER 700 YOUNG HANIDCAPPED PERSONS SEEKING TO LEAVE SCHOOL AND ENTER THE WORKPLACE. THESE PROGRAMS ARE DESIGNE ...

    SBIR Phase I 1986 Department of Education
  3. SENSITIVITY

    SBC: 3c Systems, Inc.            Topic: N/A

    THE OBJECTIVES OF PHASE 1 ARE TO ACQUIRE AND ASSEMBLE DATA ON MUNITION SENSITIVITY TO DYNAMIC INPUTS, DEVELOP DISCRETE ELEMENT CODES FOR LOADING AND REACTION OF EXPLOSIVES AND MUNITIONS, EVALUATE THE PREDICTIVE UTILITY OF THESE CODES TO PREDICT REACTION THRESHOLDS OF MUNITIONS, AND TO PLAN THE PHASE 2 PROGRAM OF TESTING AND COMPUTER MODEL IMPROVEMENT. THE GENERAL APPROACH IN PHASE 1 IS TO EVALUATE ...

    SBIR Phase I 1986 Department of DefenseNavy
  4. SYMPATHETIC DETONATION

    SBC: 3c Systems, Inc.            Topic: N/A

    THE OBJECTIVES OF PHASE 1 ARE TO ACQUIRE AND ASSEMBLE DATA ON MUNITION SENSITIVITY TO SYMPATHETIC DETONATION, DEVELOP DISCRETE ELEMENT CODES FOR LOADING AND REACTION OF EXPLOSIVES, EVALUATE THE PREDICTIVE UTILITY OF THESE CODES TO PREDICT SYMPATHETIC DETONATION OF MUNITIONS, AND TO PLAN THE PHASE 2 PROGRAM OF TESTING AND COMPUTER MODEL IMPROVEMENT. THE GENERAL APPROACH TO PHASE 1 IS TO EVALUATE TH ...

    SBIR Phase I 1986 Department of DefenseNavy
  5. HIGH PERFORMANCE LIGHTWEIGHT MANIPULATOR FEASIBILITY STUDY

    SBC: Adaptive Machine Technologies            Topic: N/A

    A MANIPULATOR DESIGN IS PROPOSED WHICH USES ADVANCED MATERIALS AND CONTROL TECHNIQUES TO ACHIEVE PERFORMANCE FAR SUPERIOR TO THAT OF CONVENTIONAL MANIPULATORS. PRELIMINARY STUDIES INDICATE THAT A MANIPULATOR CAN BE DESIGNED WITH A USEFUL LOAD CAPACITY OF 100 KILOGRAMS, A USEFUL REACH OF 2.5 METERS, AND END-EFFECTOR SPEED OF AT LEAST 5 METERS/SEC, AND A WEIGHT OF LESS THAN 500 KILOGRAMS. THE DESIGN ...

    SBIR Phase II 1986 Department of DefenseDefense Advanced Research Projects Agency
  6. DISTRIBUTED DIGITAL CONTROLLER ARCHITECTURE FOR ADAPTIVE CONTROL

    SBC: Addmaster Corp.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseNavy
  7. IMPROVED MATERIALS FOR CERAMIC ARMOR FABRICATION

    SBC: ADVANCED REFRACTORY TECHNOLOGIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseNavy
  8. ADVANCED COMPOSITES LABORATORIES WILL DEVELOP AN IMPROVED MOUNTAINEERING SKI FOR MILITARY USE.

    SBC: Advanced Composites Labs            Topic: N/A

    ADVANCED COMPOSITES LABORATORIES WILL DEVELOP AN IMPROVED MOUNTAINEERING SKI FOR MILITARY USE. WE WILL INCORPORATE THE BEST OF DOWNHILL SKI TECHNOLOGY WITH THE BEST OF TELE MARK AND MOUNTAINEERING SKI TECHNOLOGY TO PRODUCE A SKI FOR THE US MARINE CORPS WHICH WILL MEET THE REQUIREMENTS OF THE MARINE CORPS TOICS N86-13. WE WILL USE ADVANCED COMPOSITE MATERIALS TO ALLOW US TO PROVIDE A HIGH PERFORMAN ...

    SBIR Phase I 1986 Department of DefenseNavy
  9. AS THE DOD IS MOVING TOWARDS THE LARGE-SCALE USE OF ARTIFICIAL INTELLIGENCE SYSTEMS FOR SUPPORTING DECISION-MAKING AND INFORMATION ANALYSIS, IT BECOMES INCREASINGLY IMPORTANT THAT WE DEVELOP MECHANISMS FOR ASSESSING THE PERFORMANCE OF THESE SYSTEMS.

    SBC: Advanced Decision Systems            Topic: N/A

    AS THE DOD IS MOVING TOWARDS THE LARGE-SCALE USE OF ARTIFICIAL INTELLIGENCE SYSTEMS FOR SUPPORTING DECISION-MAKING AND INFORMATION ANALYSIS, IT BECOMES INCREASINGLY IMPORTANT THAT WE DEVELOP MECHANISMS FOR ASSESSING THE PERFORMANCE OF THESE SYSTEMS. WE BELIEVE THAT ASKING "HOW INTELLIGENT IS THE SYSTEM?" IS NOT THE CORRECT PERFORMANCE QUESTION AND THAT MORE APPROPRIATE ARE "DOES THE SYSTEM HELP TH ...

    SBIR Phase I 1986 Department of DefenseDefense Advanced Research Projects Agency
  10. DISTRIBUTED ELECTRONIC SIGNAL UNDERSTANDING ADS

    SBC: Advanced Decision Systems            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government