You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. COMPOSITE MATERIAL DESIGNS FOR ASROC LAUNCHER MK112

    SBC: Abaris            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseNavy
  2. PAVEMENT MANAGEMENT USING VIDEO IMAGING TECHNIQUES

    SBC: Ami Consultants            Topic: N/A

    N/A

    SBIR Phase I 1983 National Science Foundation
  3. DISPENSER STRUCTURE

    SBC: Abaris            Topic: N/A

    THIS PROJECT IS TO EXAMINE THE STRUCTURAL REQUIREMENTS OF A MUNITIONS DISPENSER, AND IDENTIFY COMPOSITE MATERIALS AND THEIR APPLICATION TO DESIGNS THAT WOULD REDUCE PARASITIC STRUCTURAL WEIGHT BY 30%. THERE ARE A VARIETY OF FIBERS, RESINS, AND MANUFACTURING PROCESSES THAT HAVE THE POTENTIAL FOR ACHIEVING SIGNIFICANT WEIGHT REDUCTION. AS THE PROPERTIES AND COSTS OF COMPLETED COMPONENTS VARYWITH MAN ...

    SBIR Phase I 1984 Department of DefenseAir Force
  4. THE PRIMARY PURPOSE OF THIS PROJECT IS TO REDUCE THE REQUIREMENTS FOR INITIAL ALIGNMENT ACCURACY WHEN BRINGING A PAIR OF CONNECTORS TOGETHER PRIOR TO MATING THEM.

    SBC: Arbus, Inc.            Topic: N/A

    THE PRIMARY PURPOSE OF THIS PROJECT IS TO REDUCE THE REQUIREMENTS FOR INITIAL ALIGNMENT ACCURACY WHEN BRINGING A PAIR OF CONNECTORS TOGETHER PRIOR TO MATING THEM. THIS WILL BE ACCOMPLISHED BY INVESTIGATING THE USE OF A TAPERED OR CONICAL DESIGN TO INCLUDE A PRELIMINARY LATCHING FEATURE TO CAPTURE AND TO CAUSE ALIGNMENT OF A PAIR OF COMPLEMENTARY CONNECTORS. THE INVESTIGATION WILL TAKE INTO CONSIDE ...

    SBIR Phase I 1984 National Aeronautics and Space Administration
  5. "CULTURING AMPHIBIANS FOR BIOMEDICAL RESEARCH"

    SBC: Central Valley Biological Inc            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of Health and Human Services
  6. COMPOSITE MATERIAL DESIGNS FOR ASROC LAUNCHER MK112

    SBC: Abaris            Topic: N/A

    ADVANCED COMPOSITES HAVE POTENTIAL FOR EFFECTING WEIGHT SAVINGS AND PROVIDING CORROSION RESISTANCE TO A VARIETY OF MILTARY APPLICATIONS. THE MK112 ASROC LAUCHER MODS 1-8 AND GUIDE, ES114, HAVE BEEN IDENTIFIED AS HAVING EXPERINECED CORROSION AND WEIGHT PROBLEMS. THERE ARE A VARIETY OF RESINS AND FIBERS AVAILABLE FOR USE AS STRUCTURAL MATERIALS THESE INCLUDE GLASS, KEVLAR & CARBON FIBERS,AND POLYEST ...

    SBIR Phase II 1985 Department of DefenseNavy
  7. STRUCTURE REPAIR

    SBC: Abaris            Topic: N/A

    ABARIS PROPOSES A DEVELOPMENT EFFORT TO RESEARCH THE PROBLEM AND CONCEPTUALIZE AN EXPERT SYSTEM TOOL FOR JOB AIDING OF THE REPAIR OF ADVANCED COMPOSITE AIRCRAFT STRUCTURE. THE SYSTEM WOULD CONSIST OF EXPERT SYSTEMS SOFTWARE, KNOWLEDGE OF AIRCRAFT COMPOSITE DESIGN, INSPECTION, AND REPAIR TECHNIQUES, STRUCTURAL ANALYSIS TOOLS, COMPUTER AIDED DESIGN ENGINEERING DATA BASE, AND VIDEO DATA STORAGE SYSTE ...

    SBIR Phase I 1985 Department of DefenseAir Force
  8. THE U.

    SBC: Abaris            Topic: N/A

    THE U.S. NAVY HAS A NEED FOR LOW COST EXPENDABLE FUEL TANKS FOR USE BY CARRIER AIRCRAFT THAT OCCUPY THE MINIMUM STORAGE SPACE. ABARIS PROPOSES TO CONDUCT AN EXPLORATORY DEVELOPMENT OF THE FABRICATION OF TANKS OF ADVANCED COMPOSITE MATERIALS. TWO CONCEPTS ARE PROPOSED. ONE USES LONGITUDINAL JOINTS OR SPLICES AND WOULD USE EITHER A BLADDER TANK OR A "WET-SKIN" STRUCTURE. THE OTHER USES CIRCUMFERENTI ...

    SBIR Phase I 1985 Department of DefenseNavy
  9. ULTRASONIC INSPECTION

    SBC: Abaris            Topic: N/A

    ABARIS PROPOSES TO DEVELOP A PORTABLE EXPERT SYSTEM THAT WILL AID THE FIELD OR ORGANIZATIONAL TECHNICIAN IN THE INTERPRETATION OF ULTRASONIC NON-DESTRUCTIVE INSPECTION FOR THE DETERMINATION OF THE SCOPE, MAGNITUDE, AND IMPACT OF INTERNAL DAMAGE TO COMPOSITE LAMINATE STRUCTURE. ONE OF THE MAJOR PROBLEMS FACING THE AIR FORCE IS THE IMPACT OF NEW ADVANCED COMPOSITE STRUCTURAL MATERIALS ENTERING OPERA ...

    SBIR Phase I 1985 Department of DefenseAir Force
  10. ARBUS, INC.

    SBC: Arbus, Inc.            Topic: N/A

    ARBUS, INC., WILL EXPLORE THE FEASIBILITY OF, AND SUBSEQUENTLY DEVELOP, A COMPUTERIZED PHARMACEUTICAL TRACKING SYSTEM FOR INVESTIGATIONAL DOSAGE FORMS. DURING PHASE I, ARBUS PERSONNEL WILL FULLY DEFINE WHAT PRODUCT DOCUMENTATION IS REQUIRED AND WHAT METHOD IS PREFERRED FOR THE SYSTEM USERS TO INTERACT WITH THE PROPOSED SYSTEM. KEY DEVELOPMENT DOCUMENTATION WILL BE DRAFTED CLARIFYING THE COMPUTER H ...

    SBIR Phase I 1985 Department of Health and Human Services
US Flag An Official Website of the United States Government