You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Power Transmission Cable for Electric Aircraft using Bio LNG for Cooling and Thermal Management

    SBC: HYPER TECH RESEARCH INC            Topic: Q

    The key problem for electric power distribution cables for double-aisle passenger aircraft is the weight of Cu or Al cables which is too high to be practical, even when the voltage is increased to kilo-volts to reduce the amperage. To carry the same power, the reduced amperage and increased voltage helps to reduce the amount of ohmic waste heat. Thus, for room temperature cables, the two issues ar ...

    SBIR Phase I 2021 Department of EnergyARPA-E
  2. Power Transmission Cable for Electric Aircraft using Bio LNG for Cooling and Thermal Management

    SBC: HYPER TECH RESEARCH INC            Topic: Q

    The key problem for electric power distribution cables for double-aisle passenger aircraft is the weight of Cu or Al cables which is too high to be practical, even when the voltage is increased to kilo-volts to reduce the amperage. To carry the same power, the reduced amperage and increased voltage helps to reduce the amount of ohmic waste heat. Thus, for room temperature cables, the two issues ar ...

    SBIR Phase II 2021 Department of EnergyARPA-E
  3. Cryo Thermal Management of High Power Density Motors and Drives

    SBC: HYPER TECH RESEARCH INC            Topic: 1

    We are solving the need to exceed 12kW/kg power density at takeoff for the motor, drive and thermal management system (TMS) for aircraft propulsion systems, In order to reach the overall systems targets called for in this solicitation, our program goal is to design and demonstrate an electric propulsion motor, drive, and TMS with a takeoff power of 17-20 kW/kg for a 2MW motor that can be scaled to ...

    SBIR Phase I 2020 Department of EnergyARPA-E
  4. Cryo Thermal Management of High Power Density Motors and Drives

    SBC: HYPER TECH RESEARCH INC            Topic: 1

    We are solving the need to exceed 12kW/kg power density at takeoff for the motor, drive and thermal management system (TMS) for aircraft propulsion systems, In order to reach the overall systems targets called for in this solicitation, our program goal is to design and demonstrate an electric propulsion motor, drive, and TMS with a takeoff power of 17-20 kW/kg for a 2MW motor that can be scaled to ...

    SBIR Phase II 2020 Department of EnergyARPA-E
  5. Cryo Thermal Management of High Power Density Motors and Drives

    SBC: HYPER TECH RESEARCH INC            Topic: 1

    We are solving the need to exceed 12kW/kg power density at takeoff for the motor, drive and thermal management system (TMS) for aircraft propulsion systems, In order to reach the overall systems targets called for in this solicitation, our program goal is to design and demonstrate an electric propulsion motor, drive, and TMS with a takeoff power of 17-20 kW/kg for a 2MW motor that can be scaled to ...

    SBIR Phase II 2020 Department of EnergyARPA-E
US Flag An Official Website of the United States Government